Madrid, January 13th 2020: EDP Renováveis, S.A. ('EDPR'), through its subsidiary EDP Renováveis Brasil, S.A. ('EDPR Brasil'), secured a 19-year private Power Purchase Agreement ('PPA') to sell the energy to be produced by Lagoa solar power plant. Lagoa solar power plant, located in the Brazilian State of Paraíba, has a total capacity of 66 MW and start of operations expected for 2022.

With this new contract EDPR reinforces its presence in a market with a low risk profile, through the establishment of long term contracts, attractive renewable resources and solid prospects in the medium and long-term.

This new solar project increases EDPR's portfolio technological diversification on which solar capacity total build-out is expected to reach 1.3 GW by 2022, after this new arrangement, EDPR has now secured 5.3 GW of the ~7.0 GW targeted global capacity build-out for 2019-2022 period, as part of its Strategic update announced in March 12th 2019.

Attachments

  • Original document
  • Permalink

Disclaimer

EDP Renovaveis SA published this content on 13 January 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 13 January 2020 09:22:02 UTC