Eastern Resources Limited announced the maiden reverse circulation (RC) drilling program at the Trigg Hill Project is complete. The Company has completed 32 generally shallow wide spaced RC holes for 1,972 metres at East Curlew and Trigg Hill prospects and has intersected pegmatites in 30 holes of the 32 holes drilled. Multiple thick downhole intervals have been intersected, including: ETRC001: 3 pegmatite intervals totalling 29m from 60m hole including 17m from surface; ETRC003: 4 pegmatite intervals totalling 22m from 60m hole including 8m from 17m; ETRC006: 7 pegmatite intervals totalling 88m from 128m hole including 39m from 51m; ETRC007: 3 pegmatite intervals totalling 43m from 60m hole including 21m from surface; ETRC008: 2 pegmatite intervals totalling 43m in 63m hole including 37m from surface; ETRC009: single pegmatite interval of 65m from surface in 68m hole; ETRC010: 3 pegmatite intervals totalling 57m in 64m hole including 43m from 20m; ETRC011: 5 pegmatite intervals totalling 58m in 86m hole including 30m from 55m; ECRC009: 3 pegmatite intervals totalling 19m in 66m hole including 13m from 49m; and ECRC020: 3 pegmatite intervals totalling 19m in 84m hole including 9m from 46m.

A total of 642 drill samples have been transferred to Perth for analysis at Nagrom. The Company plans to utilise the results of the initial phase of drilling to support further drilling planning and targeting. Trigg Hill Lithium-Tantalum Project: The Trigg Hill Project is located in East Pilbara, Western Australia and approx.

75km SE of Pilbara Minerals Ltd.'s Pilgangoora Lithium mine. The Trigg Hill mine is an old tantalum and tin mine operated during 1960s and early of 1980s. A significant number of pegmatite outcrops have been mapped over an area of 3km strike by up to 1.2km in the Trigg Hill Lithium-Tantalum Project including the East Curlew Lithium-caesium- tantalum pegmatite, which extends for at least 1,800m.

Rock-chip assays confirm extensive lithium-caesium-tantalum (LCT) pegmatites, with results up to 2.28% Li2O, 1,552ppm Cs2O, and 514ppm Ta2O5 from the Curlew East pegmatite swarm. The Company executed a binding Heads of Agreement to acquire 100% interest in the Trigg Hill Project and has recently given notice of exercise of the option.