News SummaryMost relevantAll newsOfficial PublicationsSector newsAnalyst Recommendations

Tokyo Elec. Power : (Nov 02,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Nov. 2)

share with twitter share with LinkedIn share with facebook
share via e-mail
0
11/02/2011 | 05:06am EDT
*Updates are underlined

All 6 units of Fukushima Daiichi Nuclear Power Station have been shut down.

Unit 1 (Shut down)
-Explosive sound and white smoke were confirmed after the big quake 
 occurred at 3:36 pm on March 12. It was assumed to be hydrogen explosion.
-At 3:37 pm on March 25, we started injecting freshwater to the reactor 
 and are now injecting fresh water by a motor driven pump powered by the 
 off-site transmission line.
 At 2:59 pm on October 31, we adjusted the amount of water injection to 
 the reactor to approximately 7.5m3/h in order to improve the working 
 environment inside the covering, making it sure to mitigate the steam 
 emission at the reactor building of Unit 1
 The current water injection volume is approx 7.5 m3/h from the reactor 
 feed water system.
-We commenced injection of nitrogen gas into Primary Containment Vessel at 
 1:31 am on April 7.
-At 11:22 am on August 10, we started cyclic cooling for the water in the 
 spent fuel pool by an alternative cooling equipment of the Fuel Pool 
 Cooling and Filtering System. 
-On October 28, we completed installation of the cover for the Reactor 
 Building in order to contain dispersion of radioactive substances.

Unit 2 (Shut down)
-At approximately 6:00 am on March 15, an abnormal noise began emanating 
 from nearby Pressure Suppression Chamber and the pressure within the 
 chamber decreased. 
-At 10:10 am on March 26, we started injecting freshwater to the reactor 
 and are now injecting fresh water by a motor driven pump powered by the 
 off-site transmission line. 
-At 2:59 pm on September 14, we started injecting water to the reactor 
 through core spray system water injection piping arrangement in addition 
 to the water injection through reactor feed water system piping 
 arrangement.
 Water is currently injected at approx. 2.4m3/h through reactor feed water 
 system piping arrangement, and at approx. 6.9 m3/h through core spray 
 system water injection piping arrangement.
-At 5:21 pm on May 31, we started cyclic cooling for the water in the 
 spent fuel pool by an alternative cooling equipment of the Fuel Pool 
 Cooling and Filtering System (From 10:12 am to 11:50 am on Octorber 31, 
 hydrazine [corrosion preventive] was also injected) .
-At 8:06 pm on June 28, we started injecting nitrogen gas into the Primary 
 Containment Vessel.
-At 12:53 pm on October 28, we activated the exhaust fan of the gas 
 management system of the reactor containment vessel in the reactor 
 building and started test operation. As we confirmed stable operation of 
 the system, from 6:00 pm on the same day, we put the system in operation.

Unit 3 (Shut down)
-Explosive sound and white smoke were confirmed at approximately 11:01 am 
 on March 14. It was assumed to be hydrogen explosion.
-At 6:02 pm on March 25, we started injecting fresh water to the reactor 
 and are now injecting fresh water by a motor driven pump powered by the 
 off-site transmission line.
-At 2:58 pm on September 1, we started water injection by core spray 
 system in addition to water injection by the reactor feed water system 
 piping arrangement. 
 Water is currently injected at approx. 2.5 m3/h through reactor feed 
 water system piping arrangement, and at approx. 8.1 m3/h through core 
 spray system water injection piping arrangement.
-At 7:47 pm on June 30, we started cyclic cooling for the water in the 
 spent fuel pool by an alternative cooling equipment of the Fuel Pool 
 Cooling and Filtering System.
-At 8:01 pm on July 14, injection of nitrogen gas into the Primary 
 Containment Vessel started.
 
Unit 4 (Outage due to regular inspection)
-At around 6 am on March 15, we confirmed the explosive sound and the 
 sustained damage around the 5th floor rooftop area of Reactor Building.
-At 12:44 pm on July 31, we started cyclic cooling for the water in the 
 spent fuel pool by an alternative cooling equipment of the Fuel Pool 
 Cooling and Filtering System (hydrazine [corrosion inhibitor] was 
 injected from 10:16 am to 0:10 pm on November 2). 
-At 11:34 am on August 20, we started an operation of desalination 
 equipment in the spent fuel pool.
-At this moment, we don't think there is any reactor coolant leakage 
 inside the primary containment vessel.

Unit 5 (Outage due to regular inspection)
-Sufficient level of reactor coolant to ensure safety is maintained.
-At 5:00 am on March 19, we started the Residual Heat Removal System Pump 
 in order to cool the spent fuel pool.
-At 2:30 pm on March 20, the reactor achieved cold shutdown.
-At 2:45 pm on July 15, we started the operation of the original Residual 
 Heat Removal System (System B) by its original seawater pump.
-At this moment, we don't think there is any reactor coolant leakage 
 inside the primary containment vessel.

Unit 6 (Outage due to regular inspection)
-Sufficient level of reactor coolant to ensure safety is maintained.
-At 10:14 pm on March 19, we started the Residual Heat Removal System Pump 
 of Unit 6 to cool down Spent Fuel Pool.
-At 7:27 pm on March 20, the reactor achieved cold shutdown. 
-At 2:33 pm on September 15, we started separately cooling the reactor 
 through the Residual Heat Removal System and the spent fuel pool through 
 Equipment Cooling Water System and Fuel Pool Cooling System.
-At this time, we don't think there is any reactor coolant leakage inside 
 the primary containment vessel. 

Others
-At around 10 am on June 13, we started the operation of the circulating 
 seawater purification facility installed at the screen area of Unit 2 and 
 3.
-At 8 pm on June 17, we started operation of Water Treatment Facility 
 against the accumulated water. At 6:00 pm on July 2, we started the 
 circulating injection cooling to inject the water, which was treated by 
 the accumulated water treatment system, to the reactors through the 
 buffer tank.
-At 7:41 pm on August 19, we started treatment of accumulated water by 
 parallel operation of one line from the cesium adsorption instrument to 
 the decontamination instrument and the other treatment line of the cesium 
 adsorption instrument No.2. 
-At 2:06 pm on October 7, we started to spray purified accumulated water 
 brought from Unit 5 and 6 continually in order to prevent dust scattering 
 and potential fire outbreaks from the cut down trees.
-On October 28, we started installation of the water proof wall at the sea 
 side, in front of the existing shore protection, Units 1-4, in order to 
 contain marine pollution by underground water.
-From 10:00 am to 3:00 pm on November 2, we transferred accumulated water 
 from the temporarily built tank to the Mega-float.
-At 10:11 am on November 2, we started transferring accumulated water from 
 the basement of the Unit 3 turbine building to the High Temperature 
 Incinerator Building of the Centralized Radiation Waste Treatment 
 Facility.

share with twitter share with LinkedIn share with facebook
share via e-mail
0
Latest news on TOKYO ELECTRIC POWER COMPA
06/28Jera, JXTG sign EPC contract with Toshiba units for Goi power plant
RE
06/24UPDATE1 : Tokyo stocks end slightly higher on hopes for U.S.-China trade deal
AQ
06/20TOKYO ELECTRIC POWER : Incorporated
AQ
06/18TOKYO ELECTRIC POWER : Urgent Headline News
AQ
06/04TOKYO ELECTRIC POWER : IAEA Experts Collect Seawater, Marine Sediment and Fish S..
AQ
05/24TOKYO ELECTRIC POWER : TEPCO vows to not use foreign labor at N-plant
AQ
05/22TOKYO ELECTRIC POWER : TEPCO to carefully consider hiring foreign workers at Fuk..
AQ
05/21TOKYO ELECTRIC POWER : TEPCO urged to be cautious about using foreign workers in..
AQ
05/14TOKYO ELECTRIC POWER : Regarding 'Nuclear Safety Reform Plan Progress Report'
AQ
05/13TOKYO ELECTRIC POWER : TEPCO conducts test to halt water injection into crippled..
AQ
More news
Financials (JPY)
Sales 2020 6 270 B
EBIT 2020 203 B
Net income 2020 330 B
Debt 2020 3 265 B
Yield 2020 -
P/E ratio 2020 2,58x
P/E ratio 2021 5,87x
EV / Sales2020 0,66x
EV / Sales2021 0,67x
Capitalization 852 B
Chart TOKYO ELECTRIC POWER COMPANY HOLDING INC
Duration : Period :
Tokyo Electric Power Company Holding Inc Technical Analysis Chart | MarketScreener
Full-screen chart
Technical analysis trends TOKYO ELECTRIC POWER COMPA
Short TermMid-TermLong Term
TrendsBearishBearishNeutral
Income Statement Evolution
Consensus
 
Mean consensus SELL
Number of Analysts 4
Average target price 425,00  JPY
Last Close Price 532,00  JPY
Spread / Highest target -17,3%
Spread / Average Target -20,1%
Spread / Lowest Target -22,9%
EPS Revisions
Managers
NameTitle
Tomoaki Kobayakawa Executive President & Director
Takashi Kawamura Chairman
Naomi Hirose Executive Vice Chairman
Hideko Kunii Independent Director
Keita Nishiyama Director & Head-Corporate Planning
Sector and Competitors
1st jan.Capitalization (M$)
TOKYO ELECTRIC POWER COMPANY HOLDING INC-18.40%7 884
NEXTERA ENERGY INC20.76%100 768
ENEL29.12%74 524
DUKE ENERGY CORP3.29%65 124
DOMINION ENERGY INC.8.42%62 512
IBERDROLA22.17%61 073