BAE Systems' San Diego shipyard will begin working aboard the 843-foot-long USS Boxer in June 2020. Under the awarded contract, BAE Systems will upgrade the ship to support and operate Joint Strike Fighters on-board; perform hull, tank and mechanical work; and make other shipboard improvements. The shipyard is expected to complete its work aboard the 25-year-old ship in December 2021. The contract includes options that, if exercised, would bring the cumulative value to $207.48 million.
Last October, BAE Systems simultaneously docked the USS Stethem (DDG 63) and USS Decatur (DDG 73). The guided-missile destroyers are scheduled to be re-floated together from the Pride of California drydock later this spring. The Pride of California, the largest drydock in California, is capable of lifting more than 55,000 tons.
Attachments
- Original document
- Permalink
Disclaimer
BAE Systems plc published this content on 03 April 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 03 April 2020 15:08:04 UTC