Log in
E-mail
Password
Remember
Forgot password ?
Become a member for free
Sign up
Sign up
Settings
Settings
Dynamic quotes 
OFFON

MarketScreener Homepage  >  News  >  Economy & Forex  >  All News

News : Economy & Forex

Latest NewsCompaniesMarketsEconomy & ForexCommoditiesInterest RatesBusiness LeadersFinance ProfessionalsCalendarSectors 
All NewsEconomyCurrencies / ForexCryptocurrenciesEconomic EventsPress releases

ESA European Space Agency : Practising for BepiColombo’s epic escape to Mercury

share with twitter share with LinkedIn share with facebook
share via e-mail
0
10/12/2018 | 06:43pm CEST

BepiColombo at Mercury

Practising for BepiColombo's epic escape to Mercury

12 October 2018

The international BepiColombo spacecraft will soon take flight, on a complex journey to the innermost planet of the Solar System, Mercury. Encompassing nine planetary flybys and travelling a total distance of nine billion km over a period of seven years, this will be one of the most intricate journeys ever flown by mission teams at ESA's ESOC mission control centre.

BepiColombo teams in training for voyage to Mercury

With launch set for 20 October, flight controllers led by Operations Manager Elsa Montagnon are now busily preparing for the start of what will be Europe's first mission to Mercury - the smallest and least explored terrestrial planet of the Solar System.

'Mission teams have spent months simulating BepiColombo's unique and complex journey,' explains Elsa.

'Taking turns, in 12-hour shifts, we have been practising the spacecraft's various launch and early mission processes and manoeuvres in real-time so we are prepared for every possible eventuality.'

BepiColombo is a joint mission between ESA and the Japan Aerospace Exploration Agency (JAXA). The mission comprises two science orbiters: ESA's Mercury Planetary Orbiter (MPO) and JAXA's Mercury Magnetospheric Orbiter (MMO).

BepiColombo exploded view

The ESA-built Mercury Transfer Module (MTM) will carry the orbiters to Mercury using a combination of solar electric propulsion and gravity assist flybys.

After its arrival at the planet of extremes in 2025, it will spend at least a year in orbit gathering data on Mercury's composition, density, magnetic field and exosphere, as well as probing the planet's interaction with solar wind.

Before the science begins, however, the multi-module spacecraft has to safely escape Earth, switch on, and receive instructions from mission control on where to go next.

A rocky road

Europe's space scientists have identified BepiColombo as one of the most challenging long-term planetary projects ever flown, as Mercury's proximity to the Sun makes it difficult for spacecraft to reach without being pulled into the star's enormous gravity.

Loading...

Animation visualising BepiColombo's journey to Mercury

'To get to Mercury without being subsumed by our giant star, the spacecraft will make a series of nine planetary flybys; circling Earth once, Venus twice, and Mercury itself six times,' explains Andrea Accomazzo, Flight Director for BepiColombo.

'Unlike missions that take spacecraft to the outer regions of the Solar System, the Mercury Transfer Module will use the gravity of these inner planets, in combination with the thrust provided by electric propulsion, to slow the spacecraft down.'

The Sun's huge gravity field acts as an enormous gravity 'well'. Getting a spacecraft to Mercury, and therefore close to the Sun, means dropping it into this steep well - the difficulty comes in ensuring the spacecraft ends up at Mercury and not at our gigantic star.

'The closer we get to the Sun the more we are constricted in our path,' explains Frank Budnik from the Flight Dynamics team.

BepiColombo cruise configuration

'For example, BepiColombo's large solar arrays need to be tilted at just the right angle to get enough sunlight to power the high-energy demand of the propulsion system and keeping the spacecraft running. At the same time, they mustn't get too much sunlight, or they could be beyond their limits.'

'There is only a small corridor in which the solar arrays can be operated to fulfil both of these constraints.'

BepiColombo will launch at 01:45 GMT (03:45 CEST) on 20 October, on board an Ariane 5 rocket. After the spacecraft separates from the rocket's 'upper stage', teams at ESOC will take control, sending commands to the spacecraft to get it into normal operational mode - a process that is expected to take about four days.

This period, dubbed the 'Launch and Early Orbit Phase' (LEOP), sees the control systems and instruments switched on, and their health and proper functioning assessed.

This is a risky time when the satellite is unusually vulnerable - not yet fully functional but still exposed to the hazards of space.

Simulating the scene

BepiColombo Simulation, ESA-ESOC

In preparation for this vital period, mission control teams have spent months simulating every expected scenario - the perfect LEOP, launch and separation of the satellite from the launcher, as well as a whole host of scenarios in which something goes wrong.

Establishing contact between the spacecraft and mission controllers has also been rehearsed.

Deep space ground stations across three continents will support this mission, with ESA's global antenna network maintaining links to and from BepiColombo throughout the journey.

'BepiColombo is one of the world's most ambitious interplanetary missions, and it could not be in safer hands,' says Rolf Densing, Director of Operations at ESOC.

'With decades of collective experience and hundreds of hours of simulation practice, teams at ESA's mission control are ready to set out for the rocky planet.'

Go to esa.int/live to watch the launch live from 03:15 CEST.

#WeFly

Rate this

Views

Share

  • Currently 5out of 5 Stars.
  • 1
  • 2
  • 3
  • 4
  • 5

Rating: 4.9/5 (9votes cast)

Thank you for rating!

You have already rated this page, you can only rate it once!

Your rating has been changed, thanks for rating!

222

Disclaimer

ESA - European Space Agency published this content on 12 October 2018 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 12 October 2018 16:42:08 UTC

share with twitter share with LinkedIn share with facebook
share via e-mail
0
Latest news "Economy & Forex"
12:00pOil steadies after surprise draw in U.S. crude stocks
RE
11:59aOil steadies after surprise draw in U.S. crude stocks
RE
11:58aPhilippine central bank chief extends medical leave till October 26
RE
11:58aPRESIDENT OF DEMOCRATIC SOCIALIST REPUBLIC : asks all the engineers to contribute the knowledge and experience to achieve sustainable development goals
PU
11:57aMediclinic flags drop in H1 core profit, shares dive 19 percent
RE
11:55aGERMANY : Must think pragmatically when protecting activities against foreign takeovers
RE
11:52aTesla secures Shanghai site for China Gigafactory
RE
11:48aVIETNAMESE DISSIDENT MOTHER MUSHROOM RELEASED, ON THE WAY TO U.S. : sources
RE
11:45aGERMAN FINMIN : We don't need new approach to corporate tax reform
RE
11:44aASOS shares bounce back as firm eyes 'huge' prize
RE
Latest news "Economy & Forex"
Advertisement