Greenridge Exploration Inc. provided an update on its uranium and critical metals exploration activities completed in 2025 in the Athabasca Basin region of Saskatchewan, Canada. The 2025 drill program intersected prospective lithologies for hosting uranium mineralization, namely graphitic pelitic gneisses carrying sulphides, with anomalous pathfinder geochemistry including uranium, arsenic, nickel, copper, cobalt, lead and zinc.arpenter Lake has an active exploration permit good for prospecting, geophysics, and drilling up to thirty (30) drill holes, valid to April 1, 2026. Numerous mineral showings are found within and near Flying Vee, including the on-property Nickel Lake East and Nickel Lake West nickel showings, the Day Lake gold showing, and the off-project Axis Lake nickel-copper deposit located approximately fifteen (15) kilometres to the southwest within Greenridge's 100%-owned Firebird Nickel Project.

In 2025, Axiom completed an Xcite?? airborne survey consisting of 726 line-kilometres at 100-metre line spacings, which provided high resolution EM data and detected conductive zones coincident with mineral showings such as Nickel Lake, Reeve Lake and Day Lake. The Company holds an active exploration permit for surface prospecting and sampling, geophysics, and drilled of up to 100 drill holes at Flying Vee, valid to March 31, 2028.

The Gibbons Creek property hosts high-grade uraniferous boulders located in 2013, with grades of up to 4.28% U3O8 6, and the McKenzie Lake project saw a 2023 prospecting program return three samples which included 844 ppm U-total (0.101% U3O8), 273 ppm U-total, and 259 ppm U-total. The Nut Lake property located in the Thelon Basin includes historical drilling which intersected up to 9ft of 0.69% U3O8 including 4.90% U3O8 over 1ft from 8ft depth. In 2024, Greenridge's prospecting program located a float sample that returned 31.13% U3O8, sourced from the Tundra Showing.

The Firebird Nickel property has seen two drill programs (7 holes totaling 1,339 m), where hole FN20-002 intersected 23.8 m of 0.36% Ni and 0.09% Cu, including 10.6 m of 0.55% Ni and 0.14% Cu. The Electra Nickel project 2022 drill program included results of 2,040 ppm Ni over 1m and 1,260 ppm Ni over 3.5m.