GTT has announced that it has received an order from the Hudong-Zhonghua Shipbuilding shipyard for the tank design of five new liquefied natural gas (LNG) carriers on behalf of the shipowner MISC.

GTT will design the cryogenic tanks for these vessels, each of which will have a total capacity of 174,000 m³. The tanks will be equipped with the NO96 Super+ membrane containment system developed by the company.

Delivery of the vessels is scheduled between 2029 and 2030, GTT stated.