NOVEMBER 2025
TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF
NICOLA MINING INC.
offers a unique investment opportunity combining
cash generating mill facility
permitted, past producing projects
tremendous discovery potential
low-risk, mining-friendly jurisdiction (B.C.)
Experienced management & board
KEY CATALYSTS FOR 2025 AND ON
Ramp up to full capacity at the Merritt Mill
Commenced milling of high-grade gold under Talisker partnership and preparing to receive high-grade gold ore from Blue Lagoon in Q4
Commenced 10,000-tonne bulk sample program at Dominion Creek Project in July 2025
Expect to achieve full capacity (200 tpd) in Q3 2025 and generate up to $50M/year in annual revenue before jumping to >$100M / year in 2026
Porphyry Cu vectoring at New Craigmont Project
Commenced 4,000 to 5,000 m drill program to evaluate potential porphyry targets
Commencing high-grade silver exploration
In 2025, Company received a ten-year mine extension and a multi-year exploration permit to further explore the past producing and permitted high-grade Treasure Mountain Ag-Zn-Pb Project
TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF 3
PROJECT PORTFOLIO
Unique Combination of Cash Flow and Discovery PotentialMERRITT MILL & TAILINGS FACILITY (100%)
Only facility permitted to process third party gold
and silver ores in B.C.
Modern and recently upgraded 200 tpd facility with over $35M invested to date
Longstanding milling & profit share agreements in place with mines ramping to full production
Reaching full capacity in H2 2025 with potential to generate >$50M in annual revenue
SAND/GRAVEL PIT & ROCK QUARRY OPERATIONS
Operating gravel pit
Operating rock quarry (permitted for 1,500
tonnes/day)
Operating ready-mix cement plant
Businesses running in a partnership with First Nations
NEW CRAIGMONT PROJECT (100%)
Historic Craigmont Copper Mine produced 900M lbs (34Mt @ 1.28% Cu)
Adjacent to Highland Valley Mine (largest copper mine in Canada)
Established high-grade copper skarn with potential porphyry copper system
3,300 m diamond drill program in 2025
TREASURE MOUNTAIN PROJECT (100%)
Historic high-grade Ag-Pb-Zn mine
Historical (2009) NI 43-101 resource estimate. 69 DDH
(~7,000 m) completed since 2011
Mine permit (M-239) allows up to 60K tonnes/year
In June 2025, received five-year exploration permit
DOMINION CREEK PROJECT (75%)
High-grade Au-Ag system with veins outcrop at surface
23 grab samples in 2020 averaged 61.3 g/t Au and 173.7 g/t Ag1
Permitted 10,000-tonne bulk sample program commenced in July 2025
TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF
1. Full disclosure was made in the 4
Company' s June 15, 2021 News Release
MERRITT MILL FACILITYThe only facility permitted to process gold and silver from third party sources in
British Columbia.
TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF 5
Merritt mill site
MERRITT MILL
Highly Strategic Mill Facility with Tremendous Third-Party DemandThe only facility permitted to process gold and silver
ores from third party sources in B.C.
Over 100 small-to-medium size gold/silver deposits within trucking distance with no third-party processing alternatives to the Merritt Mill
B.C.'s high regulatory requirements effectively minimizes risk of new third-party entrants and processing supply
Multi-year approval process
High CAPEX costs for mill and infrastructure construction
Public and First Nations opposition to building new processing facilities
Located in the Thompson-Okanagan mining district
Centrally located near major cities
10 km northwest of Merritt and ~3 hours from Vancouver
Easily accessible by road via Highway 8
Connected to B.C. Hydro grid power
All water permits in place for mining
6
The Gold-Silver Inventory Proximal map is not to imply that the Company will be able to benefit from the various projects noted or that such projects will have any relationship with the Company. Data from BC Data Catalogue
MERRITT MILL
Large, Modern Mill & Tailings Facility100%-owned by Nicola
200 plus tonnes per day (tpd) of
installed capacity
Includes conventional crushing, grinding and flotation circuits
On 900 acres of freehold, I-3 Industrial zoned land
Over $35M invested to date
Significant recent upgrades, including installation of:
Water recirculation system to significantly decrease water consumption
Process automation system to streamline processes, decrease production costs, improve employee safety and optimize recovery
Gravity separation system for recovery of free gold in addition to gold/silver concentrates
Built on 380 acres of freehold, industrial zoned land with ample room for future expansions.
Modern facility with significant recent upgrades
Fully lined tailings facility
TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF 7
MERRITT MILL
Milling & Profit Share Agreements in Place for 100% of Existing CapacityProfit sharing
structure
Exposure to rising gold/silver prices
Sale of gold/silver concentrates worldwide
Long-term Mining and Milling Partnership Agreement in place
Up to 75K tpy of mill feed from Dome Mountain mine
Initially targeting 55K tpy of mill feed with expected recovery of ~15K oz/year of gold
Commencing mining activities in July 2025
Nicola is a long-term partner/investor with >6% share ownership in Blue Lagoon (CSE:BLLG)
Agreement signed on April 9, 2024 and extended in May 2025
Bralorne Project hosts NI 43-101 compliant resource of 1.7M oz Au with long-term production target of 100K oz Au/year
Milling production to commence in June 2025
s
Long-term relationships with key partners
Agreement signed in January 2023
Processed ~15,000 tonnes of gold mill feed from Osisko's Carriboo Project
Purchase contract with firm specializing in global trading services.
Enables Nicola to sell gold and silver concentrate worldwide.
Three-way partnership between Nicola Mining, Infracon and Lower Nicola Indian Band.
Co-operating of gravel pit, rock quarry and cement ready mix plant
TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF 8
NEW CRAIGMONT PROJECT
Historical major copper mine (~900M lbs Cu) in prolific copper belt with high-
grade skarn and porphyry copper discovery potential
TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF 9
NEW CRAIGMONT PROJECT
100% tenure ownership of +10,800 ha property located
adjacent to Nicola's Merritt mill facility
Easily accessible via 14 km of paved roads from Merritt and adjacent to major highways (BC Highway 8 and Coquihalla)
Connected to B.C. Hydro grid power
Located in the Quesnel Tough, one of Canada's most prolific
copper belts and host to many major copper mines
Adjacent to Teck's Highland Valley Copper Mine, Canada's largest
copper mine (2024 production of ~225M lbs Cu)
Hosts major historical mine with proven geology
Craigmont Mine produced over 900M lbs of copper from 1961 to 1982 (mined ~34M tonnes at 1.28% Cu)
Shares the regional geological setting with the Highland Valley
Copper District
2023/24 drilling indicative of a potential porphyry copper system
Exploration work since 2016 has focused on (i) expanding known skarn mineralization, and (ii) defining potential copper porphyry system
Over 18,000m of diamond drilling
Property-wide geological mapping
Widespread soil sampling
Property-wide aeromagnetic and ZTEM surveys, IP surveys
10
TSX.V: NIM | FSE: HLIA | OTCQB: HUSIF
| Attention: This is an excerpt of the original content. To continue reading it, access the original document here. |
Attachments
- Original document
- Permalink
Disclaimer
Nicola Mining Inc. published this content on November 22, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on November 22, 2025 at 00:26 UTC.