AbraSilver Resource Corp. to report new high-grade drill results received from the final two diamond drill holes completed as part of the Phase I drill program, on its wholly-owned Diablillos property in Salta Province, Argentina. Discussion of Drill Hole Results: Hole DDH 21-019 extends the Tesoro Zone to the southwest, while hole DDH 21-020 was drilled south of the Tesoro Zone to test the mineralised system at depth. Hole DDH 21-019 intersected high-grade gold and silver mineralisation, with 63.0 metres of 159.6 g/t silver and 1.63 g/t gold from 118 to 181 metres, including 8.0 metres of 212.6 g/t silver and 7.72 g/t gold. This hole shows continuity of silver and gold rich mineralisation beyond the western end of the Tesoro Zone. Hole DDH 21-020 tested the southern edge of the mineralised zone as well as the underlying sulphide root zone. The hole intersected 19.5 metres of 148.9 g/t silver and 0.21g/t gold from 149.5 to 169 metres. In addition, results from the sulphide zone intersected 20.0 metres of 27.4 g/t silver, 1.45 g/t gold and 1.89% copper from 317.5 to 322.5 metres, including 5.0 metres of 39.2 g/t silver, 4.46 g/t gold and 2.54% copper. Hole DDH 21-020 demonstrates continuity of the high-grade copper-gold mineralisation underlying the oxide resources in the sulphide zone, which will be systematically explored over the coming months.