ACS Group, through Dragados USA and Flatiron (Hochtief), in Joint Venture with Vinci Grands Projects, has been selected as the best value proposal based on bid price and technical score for the 3.3 billion I-64 Hampton Roads Bridge-Tunnel project in Virginia. Bringing world-class capabilities in tunneling, bridge and highway construction, ACS will lead the consortium to design and build this mega project, with 67 % share in the Joint Venture. The I-64 Hampton Roads Bridge-Tunnel in southeastern Virginia has long been one of the region's most congested corridors. The existing 3.5-mile facility consists of two 2- lane immersed-tube tunnels on artificial islands, with trestle bridges to shore. The Project will consist of the design and construction of improvements along approximately nine (9) miles of the I-64 corridor between Settlers Landing Road in Hampton and I-564 in Norfolk. The scope includes a new bridge-tunnel crossing, approximately 3.5 miles long and generally parallel to the existing Hampton Roads Bridge-Tunnel, and replacement of the existing marine approach bridges between the Hampton Roads Bridge-Tunnel islands and the shorelines. The new twin-tunnels, which will be constructed as bored tunnels using a TBM, will add four new lanes of traffic resulting in a total of eight lanes of capacity across the water. On land, the Project includes the addition of a third lane to I-64 in each direction with a roadway section sufficient to accommodate a part-time median shoulder lane. To optimize congestion management and increase travel time reliability along the I-64 corridor, the new capacity created by the Project will include high-occupancy toll lanes ("Express Lanes") in each direction.