ACWA POWER Company announced the start of operation for Shuaa Energy 3-s 300MW of Phase B, achieved ahead of schedule. Phase B is part of the 900 MW Photovoltaic Solar Power - Independent Power Project Phase V, MBR Solar Park located in the Emirate of Dubai, UAE. Total capacity under operation reaches 600MW.