Aeris Resources Limited provided the results from the recent near-surface Reverse Circulation (RC) drilling program on the Roses Pride deposit at the Company's Cracow Gold Operations (Cracow). Roses pride near surface drill target: Gold mineralisation within the Cracow operation is associated low sulphidation epithermal mineralisation formed along multiple fault structures over the current known footprint of 4 kilometres x 4 kilometres. Along each mineralised structure, higher grade gold shoots form at sites of increased dilation and fluid flow. The Roses Pride high grade deposit represents the northernmost ore deposit mined at Cracow since modern mining commenced in 2004. Underground activities at Roses Pride accessed and mined the deposit to 200 metres below surface. Intermittent surface drill programs have been completed in the past, seeking to define up-plunge, near surface extensions to the Roses Pride mineralised system. Prior drilling had been successful in intersecting the mineralised structure above and along strike from underground workings, however the results had not been sufficient to enable a Mineral Resource estimate to be generated. The intent of the 2020 RC drill program was to systematically drill test the interpreted mineralisation above and along strike (north) of the underground workings. The drill program was completed on a nominal 20 metres (strike) x 20 metres (down dip) spacing along a 400 metre strike length. Assay results have returned for 44 of the 48 drillholes from the 2020 RC drill program and are highly encouraging, with gold mineralisation intersected along the entire drilled strike length (400 metres). Significant drillhole intersections from the program include: RPS003 19.0m @ 5.45 g/t Au (true thickness 10.1 m); RPS025 15.0m @ 4.10 g/t Au (true thickness 6.1m); RPS050 5.0m @ 5.33 g/t Au (true thickness 3.3m); RPS054 10.0m @ 5.13 g/t Au (true thickness 4.7m). The drillhole data is now being used to generate a maiden Mineral Resource estimate for the shallower section of the Roses Pride mineralised system. A follow-up RC drill program is being planned later in the current financial year to expand the mineralised system further along strike (north and south) and to test down plunge continuity below higher grade drill intersections. Mineral Resource Estimate is expected in second quarter of fiscal year 2021.