ersonal use only

Eloise Copper Mine Almanac

March 2022

Important information

This presentation has been prepared by AIC Mines Limited (ABN 11060156452) ("the Company" or "AIC Mines") to provide summary information about AIC Mines and its activities at the date of this presentation. The information contained in this presentation does not purport to be complete, and it should be read in conjunction with AIC Mines' other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange, which are available at www.asx.com.au or www.aicmines.com.au.

The presentation should not be construed as an offer or invitation to subscribe for or purchase securities in AIC Mines.

onlyStatements in this document are made only as of the date of this document unless otherwise stated and the information in this document remains subject to change without notice. No responsibility or liability is assumed by AIC Mines or any of its affiliates for updating any information in this document or to inform any recipient of any new or more accurate information or any errors or mis-descriptions of which AIC Mines and any of its affiliates or advisers may become aware.

The information contained in this document has been prepared in good faith by AIC Mines, however no guarantee, representation or warranty expressed or implied is or will be made by any person (including AIC Mines and its affiliates and their directors, officers, employees, associates, advisers and agents) as to the accuracy, reliability, correctness, completeness or adequacy of any statements, estimates, options, conclusions or other information contained in this document.

To the maximum extent permitted by law, AIC Mines and its affiliates and their directors, officers employees, associates, advisers and agents each expressly disclaims any and all liability, including, without limitation, any liability arising out of fault or

egligence, for any loss arising from the use of or reliance on information contained in this document including representations or warranties or in relation to the accuracy or completeness of the information, statements, opinions, forecasts, reports or

other matters, express or implied, contained in, arising out of or derived from, or for omissions from, this document including, without limitation, any financial information, any estimates or projections and any other financial information derived therefrom.

F rward looking statements

Certain information in this document refers to the intentions of AIC Mines, but these are not intended to be forecasts, forward looking statements or statements about the future matters for the purposes of the Corporations Act or any other applicable law. The occurrence of the events in the future are subject to risk, uncertainties and other actions that may cause AIC Mines' actual results, performance or achievements to differ from those referred to in this document. Accordingly, AIC Mines and its affiliates and their directors, officers, employees and agents do not give any assurance or guarantee that the occurrence of these events referred to in the document will actually occur as contemplated.

Statements contained in this document, including but not limited to those regarding the possible or assumed future costs, performance, dividends, returns, revenue, exchange rates, potential growth of AIC Mines, industry growth or other projections and any estimated company earnings are or may be forward looking statements. Forward-looking statements can generally be identified by the use of words such as 'project', 'foresee', 'plan', 'expect', 'aim', 'intend', 'anticipate', 'believe', 'estimate', 'may',

'

hould', 'target' or 'will' or similar expressions. These statements relate to future events and expectations and as such involve known and unknown risks and significant uncertainties, many of which are outside the control of AIC Mines. Actual results,

performance, actions and developments of AIC Mines may differ materially from those expressed or implied by the forward-looking statements in this document.

S

ch forward-looking statements speak only as of the date of this document. There can be no assurance that actual outcomes will not differ materially from these statements. To the maximum extent permitted by law, AIC Mines and any of its affiliates

and their directors, officers, employees, agents, associates and advisers:

use

disclaim any obligations or undertaking to release any updates or revisions to the information to reflect any change in expectations or assumptions;

do not make any representation or warranty, express or implied, as to the accuracy, reliability or completeness of the information in this document, or likelihood of fulfilment of any forward-looking statement or any event or results expressed or

implied in any forward-looking statement; and

disclaim all responsibility and liability for these forward-looking statements (including, without limitation, liability for negligence).

No new information or data

I

formation relating to exploration results is extracted from recent ASX announcements released by AIC Mines. The Company confirms that it is not aware of any new information or data that materially affects the information included in these

a

ouncements.

ersonal

Authorisation

This presentation has been approved for issue by, and enquiries regarding this report may be directed to Aaron Colleran, AIC Mines Managing Director - email info@aicmines.com.au

AIC Mines

A growth company leveraged to

the copper price and exploration

success

only

Operating foothold established in

the Mt Isa - Cloncurry region, one

of the most significant copper

producing regions in the world.

All assets located in mining friendly

use

jurisdictions.

Building a portfolio of mines through

ersonal

exploration, development and

acquisition.

Lamil

Project

Marymia

Project

Perth

Exploration

Office

Mt Isa

Eloise

Copper Mine

Brisbane

Delamerian

Project

Sydney

Corporate

Office

3

onlyEloise Copper useMine

ersonal

Strong Free Cashflow

A producing mine with a 26-year history providing strong free cashflow with relatively low technical risk.

A great time to be a copper producer

Strong demand and price outlook for copper.

Excellent exploration potential

High-grade ore body with a robust mine life supported by current reserves and resources. Clear potential to further extend the mine life.

A great location

One of the most significant copper producing regions of the world.

Ability to add value

Ability to add value through resource growth, operational reliability and regional consolidation.

4

Eloise Copper Mine

Overview

only

Location

60km SE of Cloncurry and 155km ESE of Mt Isa

Tenements

Mining leases covering 505.9 ha

Mineralisation

Iron Sulphide Copper Gold (ISCG).

Mineral Resources

103,500t Cu and 93,300oz Au

Ore Reserves

30,300t Cu and 26,700oz Au

Mining Method

The upper levels of the mine are extracted by longhole open stoping and the deep

use

levels are extracted by sublevel caving

Operating Structure

Owner-miner with contractor for underground development

Processing Method

Conventional crushing, grinding and sulphide floatation circuit

Processing Capacity

750ktpa processing capacity

Recovery

94 - 95% Cu

Concentrate production

45 - 50ktpa grading 27% Cu and 4g/t Au. No deleterious elements.

ersonal

Royalties

Queensland State royalty. No other royalties.

Workforce

Approx. 150 employees and 80 contractors. FIFO. On site accommodation.

On site diesel generators (owned). The powerhouse has total generating capacity

Power

of 12MW and consists of seven high voltage (1.5MW) and three low voltage

(0.7MW) generators.

Established bore field with annual allocation of 355ML and current annual

Water

consumption of approximately 200ML. Water is harvested through runoff into two

dams during high rainfall events.

5

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

AIC Mines Limited published this content on 22 March 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 23 March 2022 01:13:11 UTC.