ersonal use only
Eloise Copper Mine Almanac
March 2022
Important information
This presentation has been prepared by AIC Mines Limited (ABN 11060156452) ("the Company" or "AIC Mines") to provide summary information about AIC Mines and its activities at the date of this presentation. The information contained in this presentation does not purport to be complete, and it should be read in conjunction with AIC Mines' other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange, which are available at www.asx.com.au or www.aicmines.com.au.
The presentation should not be construed as an offer or invitation to subscribe for or purchase securities in AIC Mines.
onlyStatements in this document are made only as of the date of this document unless otherwise stated and the information in this document remains subject to change without notice. No responsibility or liability is assumed by AIC Mines or any of its affiliates for updating any information in this document or to inform any recipient of any new or more accurate information or any errors or mis-descriptions of which AIC Mines and any of its affiliates or advisers may become aware.
The information contained in this document has been prepared in good faith by AIC Mines, however no guarantee, representation or warranty expressed or implied is or will be made by any person (including AIC Mines and its affiliates and their directors, officers, employees, associates, advisers and agents) as to the accuracy, reliability, correctness, completeness or adequacy of any statements, estimates, options, conclusions or other information contained in this document.
To the maximum extent permitted by law, AIC Mines and its affiliates and their directors, officers employees, associates, advisers and agents each expressly disclaims any and all liability, including, without limitation, any liability arising out of fault or
egligence, for any loss arising from the use of or reliance on information contained in this document including representations or warranties or in relation to the accuracy or completeness of the information, statements, opinions, forecasts, reports or
other matters, express or implied, contained in, arising out of or derived from, or for omissions from, this document including, without limitation, any financial information, any estimates or projections and any other financial information derived therefrom.
F rward looking statements
Certain information in this document refers to the intentions of AIC Mines, but these are not intended to be forecasts, forward looking statements or statements about the future matters for the purposes of the Corporations Act or any other applicable law. The occurrence of the events in the future are subject to risk, uncertainties and other actions that may cause AIC Mines' actual results, performance or achievements to differ from those referred to in this document. Accordingly, AIC Mines and its affiliates and their directors, officers, employees and agents do not give any assurance or guarantee that the occurrence of these events referred to in the document will actually occur as contemplated.
Statements contained in this document, including but not limited to those regarding the possible or assumed future costs, performance, dividends, returns, revenue, exchange rates, potential growth of AIC Mines, industry growth or other projections and any estimated company earnings are or may be forward looking statements. Forward-looking statements can generally be identified by the use of words such as 'project', 'foresee', 'plan', 'expect', 'aim', 'intend', 'anticipate', 'believe', 'estimate', 'may',
' | hould', 'target' or 'will' or similar expressions. These statements relate to future events and expectations and as such involve known and unknown risks and significant uncertainties, many of which are outside the control of AIC Mines. Actual results, | |
performance, actions and developments of AIC Mines may differ materially from those expressed or implied by the forward-looking statements in this document. | ||
S | ch forward-looking statements speak only as of the date of this document. There can be no assurance that actual outcomes will not differ materially from these statements. To the maximum extent permitted by law, AIC Mines and any of its affiliates | |
and their directors, officers, employees, agents, associates and advisers: | ||
use | disclaim any obligations or undertaking to release any updates or revisions to the information to reflect any change in expectations or assumptions; | |
| ||
| do not make any representation or warranty, express or implied, as to the accuracy, reliability or completeness of the information in this document, or likelihood of fulfilment of any forward-looking statement or any event or results expressed or | |
implied in any forward-looking statement; and | ||
| disclaim all responsibility and liability for these forward-looking statements (including, without limitation, liability for negligence). | |
No new information or data | ||
I | formation relating to exploration results is extracted from recent ASX announcements released by AIC Mines. The Company confirms that it is not aware of any new information or data that materially affects the information included in these | |
a | ouncements. | |
ersonal |
Authorisation
This presentation has been approved for issue by, and enquiries regarding this report may be directed to Aaron Colleran, AIC Mines Managing Director - email info@aicmines.com.au
AIC Mines
A growth company leveraged to
the copper price and exploration | |
success | |
only | Operating foothold established in |
| |
the Mt Isa - Cloncurry region, one | |
of the most significant copper | |
producing regions in the world. | |
| All assets located in mining friendly |
use | jurisdictions. |
Building a portfolio of mines through | |
ersonal | exploration, development and |
acquisition. | |
Lamil
Project
Marymia
Project
Perth
Exploration
Office
Mt Isa
Eloise
Copper Mine
Brisbane
Delamerian
Project
Sydney
Corporate
Office
3
onlyEloise Copper useMine
ersonal
Strong Free Cashflow
A producing mine with a 26-year history providing strong free cashflow with relatively low technical risk.
A great time to be a copper producer
Strong demand and price outlook for copper.
Excellent exploration potential
High-grade ore body with a robust mine life supported by current reserves and resources. Clear potential to further extend the mine life.
A great location
One of the most significant copper producing regions of the world.
Ability to add value
Ability to add value through resource growth, operational reliability and regional consolidation.
4
Eloise Copper Mine
Overview
only | Location | 60km SE of Cloncurry and 155km ESE of Mt Isa | ||
Tenements | Mining leases covering 505.9 ha | |||
Mineralisation | Iron Sulphide Copper Gold (ISCG). | |||
Mineral Resources | 103,500t Cu and 93,300oz Au | |||
Ore Reserves | 30,300t Cu and 26,700oz Au | |||
Mining Method | The upper levels of the mine are extracted by longhole open stoping and the deep | |||
use | levels are extracted by sublevel caving | |||
Operating Structure | Owner-miner with contractor for underground development | |||
Processing Method | Conventional crushing, grinding and sulphide floatation circuit | |||
Processing Capacity | 750ktpa processing capacity | |||
Recovery | 94 - 95% Cu | |||
Concentrate production | 45 - 50ktpa grading 27% Cu and 4g/t Au. No deleterious elements. | |||
ersonal | Royalties | Queensland State royalty. No other royalties. | ||
Workforce | Approx. 150 employees and 80 contractors. FIFO. On site accommodation. | |||
On site diesel generators (owned). The powerhouse has total generating capacity | ||||
Power | of 12MW and consists of seven high voltage (1.5MW) and three low voltage | |||
(0.7MW) generators. | ||||
Established bore field with annual allocation of 355ML and current annual | ||||
Water | consumption of approximately 200ML. Water is harvested through runoff into two | |||
dams during high rainfall events. | ||||
5
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
AIC Mines Limited published this content on 22 March 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 23 March 2022 01:13:11 UTC.