Aloro Mining Corp. announced that it will resume drilling at the Los Venados (LV) Project this weekend. The first round of drilling will include four drill holes for approximately 1200 meters of drilling. The new drilling will be focused on the blind target in the southeast corner of the Los Venados concession which was discovered by drill hole LVRC-012. That hole cut 32m of blind strong silicic alteration with brecciated vuggy silica and sulfides containing the best gold intercept of 4.57 meters of 1.72 gpt Au. The intercept is interpreted to be at the margin of concealed felsic dome similar to that hosting high-grade mineralization in the Escondida zone 1300m to the east.