ALORO MINING CORP. announced that it has mobilized a Reverse Circulation (RC) drill rig to the Los Venados Project. The RC drill rig was expedited from Hermosillo, Sonora to Mulatos, Sonora this morning. The RC drill rig will move on site to the # 1 drill pad to set up and begin drilling later that day. The decision to use the RC drill rig was based on the information that RC drilling has been proven to get better recovery in the surrounding area because it takes a bigger sample and is more representative of the ground being drilled.