German engineering firm Kuttner has completed the final plant engineering design and cost estimation.
The Basic Engineering phase has confirmed key design parameters, locking in key equipment capacities and validating operational criteria. Kuttner will immediately commence the procurement process, and construction of the pilot plant will follow when equipment begins arriving towards the back end of this year. The pilot plant is designed to produce 120kg per day of Silumina AnodesTM coated battery anode material, which will be made available to selected European battery manufacturers and auto-makers. The pilot plant will be established in Dock3 (leased warehouse space), next door to Altech's land in
Altech, with its cash position at the end of
Kuttner is a German-based industrial plant engineering and EPC contractor, with strong experience in design, procurement, project and construction management and plant commissioning across a range of industries. They have previously completed metallurgical plant, water and off-gas treatment projects in
Contact:
Tel: +61 8 6168 1555
Email: info@altechchemicals.com
(C) 2022 Electronic News Publishing, source