Anglo American plc provided production guidance for year 2021. For the year, the company expected diamonds production is tightened to ~32 million carats (previously 32-33 million carats) (100% basis), due to continuing operational challenges, subject to the extent of any further Covid-19 related disruptions. Copper production expected is tightened to 650,000-660,000 tonnes (previously 650,000-680,000 tonnes), due to plant performance challenges at Los Bronces, subject to water availability and the extent of any Covid-19 related disruption. Platinum Group Metals production guidance (metal in concentrate) is unchanged at 4.2-4.4 million ounces. Refined production guidance is unchanged at 4.8-5.0 million ounces(2), subject to the potential impact of Eskom load-shedding. Both are subject to the extent of further Covid-19 related disruption. Iron Ore production guidance (wet basis) is tightened to ~64.5 million tonnes (previously 64.5 - 66.5 million tonnes) (Kumba ~40.5 million tonnes (previously 40.5 - 41.5 million tonnes) owing to rail in South Africa performing below planned levels. Metallurgical Coal Production guidance is unchanged at 14-16 million tonnes, subject to the extent of any Covid-19 related disruption. Nickel Production guidance is unchanged at 42,000-44,000 tonnes, subject to the extent of further Covid-19 related disruption.