Apollo Minerals Limited reported additional results received from the drilling program at the province-scale Kroussou zinc-lead project (Kroussou Project or Project) in Gabon. The Phase 1 drilling program at Dikaki consisted of 46 diamond drill holes for 2,260m. Assays have been received from 20 drill holes, with the latest 9 being reported in this announcement. The assay results are demonstrating extensive high-grade zinc and lead mineralisation and the potential for a large-scale, shallow, flat-lying, broad mineralised system at Dikaki. Dikaki is situated at the centre of the Kroussou project area and represents one of four prospects with historic drilling activity. Apollo Mineral's diamond drilling program at Dikaki was designed to test for the presence of mineralisation near historic exploration conducted by the French Bureau de Recherches Géologiques et Minières (BRGM). Historic drilling completed by BRGM at Dikaki identified a variety of mineralisation styles, but the holes were either not sampled or only character-sampled (i.e. only select visually identifiable intervals were sampled, often ending in significant mineralisation). Mineralisation at Dikaki is shallow (0-30m from surface) with mineralisation up to 40m thick (estimated true thickness); this geometry of mineralisation is interpreted to be favorable to potential shallow, open-pit mining scenarios. Significantly, three holes (DKDD052, 056 and 057) have demonstrated shallow grade x thickness accumulations of greater than 50%m (Zn+Pb% x thickness). These metal accumulations demonstrate the significant metal potential within the Dikaki mineralised system. The results also demonstrate the potential for the mineralised system to extend across the entire channel width. Significant intersections have been recorded at shallow depths (from 5.5m), with thicknesses up to 41m, in the 9 drill holes reported herein. Thick, high grade intervals, with grades up to 9.5m @ 4.6% Zn+Pb, are recorded within the broader mineralised zone. Select intercepts include: 11.3m @ 3.4% Zn+Pb from 9.0m in DKDD059 - open along section for 360m including 7.8m @ 4.1% Zn+Pb from 11.5m 18.7m @ 2.8% Zn+Pb from 5.5m in DKDD052 - open along section for 400m including 9.5m @ 4.6 % Zn+Pb from 7.9m 10.5m @ 2.5% Zn+Pb from 15.6m in DKDD053 - open along section for 400m including 3.9m @ 4.0% Zn+Pb from 21.0m. 38.2m @ 2.1% Zn+Pb from 20.0m in DKDD057 - open for 200m along section including 12m @ 4.1% Zn+Pb from 28.0m 22.5m @ 2.0% Zn+Pb from 36.0m in DKDD056 - open for 160m along section including 4.5m @ 4.0% Zn+Pb from 36.6m and 6.1m @ 3.9% Zn+Pb from 52.4m.