Arc Minerals Limited announced further near-surface, wide intersections of copper mineralisation with high-grade intercepts from its maiden diamond drill exploration programme at the Cheyeza East target in Zambia. Highlights: CHDDE058 intersected 68.75m @ 0.61% Cu from 7.50m; Includes 1.14% Cu over 8.00m from 11.50m; and 1.09% Cu over 3.00m from 41.50m; and 1.14% Cu over 11.50m from 61.50m; CHDDE061 intersected 26.50m @ 0.99% Cu from 18.50m; Includes 1.63% Cu over 9.50m from 35.50m; CHDDE062 intersected 33.00m @ 0.71% Cu from 18.00m; Includes 0.92% Cu over 4.50m from 23.50m; and 1.44% Cu over 8.5m from 42.50m. Hole CHDDE058 drilled on the same profile and between holes CHDDE059 and CHDDE060, intersected 24m @ 0.76% Cu and 39m @ 1.47% Cu respectively. Through hole CHDDE060, this profile has the highest average grade intersection and now with hole CHDDE059, this profile also has the thickest continuous mineralised interval intersected to date at Cheyeza East. Drill holes CHDDE061 and CHDDE062 were drilled on the eastern edge of the current defined core to the mineralisation at Cheyeza East. Both holes have intersected significant mineralisation and confirm that the mineralisation is still open at this end of the core.