COCGW-08-2021
ARCELORMITTAL SOUTH AFRICA
VANDERBIJLPARK WORKS
EXTERNAL AUDIT ON ROD FOR THE
COKE OVEN CLEAN GAS AND WATER PROJECT
August 2021
Esicongweni Environmental Services | 1 |
REPORT TITLE:
ARCELORMITTAL SOUTH AFRICA, VANDERBIJLPARK WORKS, EXTERNAL AUDIT ON ROD FOR THE COKE OVEN CLEAN GAS AND WATER PROJECT
PREPARED BY | AUTHOR | |||
Esicongweni Environmental Services | Martin Bezuidenhout | |||
Cell: 073 433 4656 | ||||
Fax: 086 513 5309 | ||||
e-mail:martinbez.ees@gmail.com | ||||
Western Cape Branch (Head Office) | ||||
Tel: (087) 806 1157 - office hours | ||||
Unit A0, Cape Sands, Strand, 7140 | ||||
Free State Branch | ||||
Tel: (051) 407 7642 - office hours | ||||
PO Box 42360, Heuwelsig, 9332 | ||||
JM Bezuidenhout | ||||
KEYWORDS: | COCGW, external audit, RoD, compliance, ArcelorMittal, | |||
Coke Ovens, GDARD | ||||
CO-ORDINATES: | Longitude | 26°37'50.07" S | ||
Latitude | 27°52'28.75" E | |||
LOCATION: | ArcelorMittal Vanderbijlpark Works, Vanderbijlpark, | |||
Gauteng Province | ||||
DATE: | 18 August 2021 | |||
ARCELORMITTAL PERSONNEL: | Mr Johan Hattingh | |||
Mr Terrence Wilson |
Table of Contents | |
2. AUDIT OBJECTIVES................................................................................................................................... | 6 |
3. AUDIT METHODOLOGY ........................................................................................................................... | 7 |
4. AUTHORISED ACTIVITIES ......................................................................................................................... | 7 |
5. APPRAISAL OF RoD CONDITIONS............................................................................................................. | 8 |
Table 1: RoD Conditions ............................................................................................................................ | 10 |
6. DISCUSSION AND RECOMMENDATIONS ............................................................................................... | 27 |
Addendums
Addendum A - RoD dated 24/05/2004
Addendum B - Amendment, dated April 2009
Addendum C - Amendment, dated November 2009
Addendum D - Amendment, dated June 2010
Addendum E - Amendment, dated September 2019
Addendum F - Works Fresh Water Abstraction
Addendum G - Discharge to Rietspruit
Addendum H - Coke Production Dust Emissions
Addendum I - H2S in Coke Oven Gas
Addendum J - Borehole Trend Graphs
Addendum K - Quarterly Progress Report (June 2021)
Addendum L - Rietspruit Discharge: Conductivity
Addendum M - Raw tar to AMCC
Addendum N - Coke Breeze Production
Addendum O - Coal, Tar and Ash Produced / Disposed
Addendum P - EMP for the Operation of the COCGW Project
Esicongweni Environmental Services | 3 |
Abbreviations | ||
C | - | Compliance |
NC | - | Non-Compliance |
WUL | - | Water Use License |
AMSA | - | ArcelorMittal South Africa Limited |
AMVW | - | ArcelorMittal South Africa Vanderbijlpark Works |
EES | - | Esicongweni Environmental Services cc |
DEA | - | Department of Environmental Affairs |
DWA | - | Department of Water Affairs |
DWAF | - | Department of Water Affairs and Forestry |
DWS | - | Department of Water and Sanitation |
IWWMP | - | Integrated Water and Waste Management Plan |
RSIP | - | Rehabilitation Strategy and Implementation Program |
ECA | - | Environment Conservation Act |
RoD | - | Record of Decision |
CETP | - | Central Effluent Treatment Plant |
WUA | - | Water User Association |
COG | - | Coke Oven Gas |
GDACE | - | Gauteng Department of Agriculture, Conservation and Environment |
GDARD | - | Gauteng Department of Agriculture and Rural Development |
COCGW | - | Cleaning of Coke Oven Gas and Water (Project) |
BAT | - | Best Available Technology |
Steam from the quenching of hot coke at the quench tower
Esicongweni Environmental Services | COCGW RoD Audit Report | 4 |
1. INTRODUCTION
ArcelorMittal South Africa Limited (AMSA) is the largest steel producer on the African continent. ArcelorMittal operates an integrated production facility north of the town of Vanderbijlpark, Gauteng (Figure 1). The plant has been operational since 1952 and the products are sold on both the local and international markets.
AMSA Vanderbijlpark Works (AMVW) embarked on a holistic integrated environmental study during the period 2000 to 2003 to obtain a better understanding of the environmental risks that the company faced. The main driver of the company's environmental improvement initiatives has been environmental legislation that was supported by environmental management systems certified in accordance with the ISO14001 standard.
An application for a Record of Decision (RoD) was lodged with the Gauteng Department of Agriculture, Conservation and Environment (GDACE) currently known as Gauteng Department of Agriculture and Rural Development (GDARD) to undertake the Coke Oven Clean Gas and Water Project activities. The application was lodged to fulfil the requirements of the Environmental Conservation Act (ECA; No 73 of 1989), which was then repealed and replaced by the National Environmental Management Act (NEMA; No 107 of 1998) (as amended), due to the proposed activity deemed to have a potential impact on the environment. The aim of the project was to improve the combustion efficiency of the coke oven gas and to mitigate air quality impacts arising from the combustion of un-cleaned coke oven gas.
The GDACE granted ISCOR Vanderbijlpark Steel (like AMSA was named in 2004) authorisation via a RoD with reference number Gaut 002/02-03/138 on 24 May 2004.
The RoD defined the project scope as follow:
- Proposed Changes to Coke Ovens by-products Plant
- Proposed Changes to the Gas Cleaning Line
- Cleaning of Excess Process Water
The RoD authorised the activities under the following headings:
- Modification of Gas Line 1
- Primary Coolers - Gas Lines 3 & 4, and Gas Lines 6-9
- Chilled Water Station/ Coo/Ing Water Supply Facilities
- Installation of a New Pre-Decanter/ Modification of Tar Decanters
- Installation of a Gravel Filter Unit
- Upgrading of the Existing Ammonia Stills
- Installation of the New Stripper/ De-acidifier System
- Scrubbing Facilities -Gas Lines 3 & 4
- Scrubbing Facilities - Gas Lines 6-9
- Elementary Sulphur Plant combined with NH3 Cracking
- Control System
There are Specific- and General Conditions in the RoD including Reporting Requirements.
Esicongweni Environmental Services (EES) was appointed by AMSA to undertake an external audit of conditions relating to this RoD.
Esicongweni Environmental Services | COCGW RoD Audit Report | 5 |
Attachments
- Original document
- Permalink