COCGW-08-2021

ARCELORMITTAL SOUTH AFRICA

VANDERBIJLPARK WORKS

EXTERNAL AUDIT ON ROD FOR THE

COKE OVEN CLEAN GAS AND WATER PROJECT

August 2021

Esicongweni Environmental Services

1

REPORT TITLE:

ARCELORMITTAL SOUTH AFRICA, VANDERBIJLPARK WORKS, EXTERNAL AUDIT ON ROD FOR THE COKE OVEN CLEAN GAS AND WATER PROJECT

PREPARED BY

AUTHOR

Esicongweni Environmental Services

Martin Bezuidenhout

Cell: 073 433 4656

Fax: 086 513 5309

e-mail:martinbez.ees@gmail.com

Western Cape Branch (Head Office)

Tel: (087) 806 1157 - office hours

Unit A0, Cape Sands, Strand, 7140

Free State Branch

Tel: (051) 407 7642 - office hours

PO Box 42360, Heuwelsig, 9332

JM Bezuidenhout

KEYWORDS:

COCGW, external audit, RoD, compliance, ArcelorMittal,

Coke Ovens, GDARD

CO-ORDINATES:

Longitude

26°37'50.07" S

Latitude

27°52'28.75" E

LOCATION:

ArcelorMittal Vanderbijlpark Works, Vanderbijlpark,

Gauteng Province

DATE:

18 August 2021

ARCELORMITTAL PERSONNEL:

Mr Johan Hattingh

Mr Terrence Wilson

Table of Contents

1. INTRODUCTION .......................................................................................................................................

5

2. AUDIT OBJECTIVES...................................................................................................................................

6

3. AUDIT METHODOLOGY ...........................................................................................................................

7

4. AUTHORISED ACTIVITIES .........................................................................................................................

7

5. APPRAISAL OF RoD CONDITIONS.............................................................................................................

8

Table 1: RoD Conditions ............................................................................................................................

10

6. DISCUSSION AND RECOMMENDATIONS ...............................................................................................

27

Addendums

Addendum A - RoD dated 24/05/2004

Addendum B - Amendment, dated April 2009

Addendum C - Amendment, dated November 2009

Addendum D - Amendment, dated June 2010

Addendum E - Amendment, dated September 2019

Addendum F - Works Fresh Water Abstraction

Addendum G - Discharge to Rietspruit

Addendum H - Coke Production Dust Emissions

Addendum I - H2S in Coke Oven Gas

Addendum J - Borehole Trend Graphs

Addendum K - Quarterly Progress Report (June 2021)

Addendum L - Rietspruit Discharge: Conductivity

Addendum M - Raw tar to AMCC

Addendum N - Coke Breeze Production

Addendum O - Coal, Tar and Ash Produced / Disposed

Addendum P - EMP for the Operation of the COCGW Project

Esicongweni Environmental Services

3

Abbreviations

C

-

Compliance

NC

-

Non-Compliance

WUL

-

Water Use License

AMSA

-

ArcelorMittal South Africa Limited

AMVW

-

ArcelorMittal South Africa Vanderbijlpark Works

EES

-

Esicongweni Environmental Services cc

DEA

-

Department of Environmental Affairs

DWA

-

Department of Water Affairs

DWAF

-

Department of Water Affairs and Forestry

DWS

-

Department of Water and Sanitation

IWWMP

-

Integrated Water and Waste Management Plan

RSIP

-

Rehabilitation Strategy and Implementation Program

ECA

-

Environment Conservation Act

RoD

-

Record of Decision

CETP

-

Central Effluent Treatment Plant

WUA

-

Water User Association

COG

-

Coke Oven Gas

GDACE

-

Gauteng Department of Agriculture, Conservation and Environment

GDARD

-

Gauteng Department of Agriculture and Rural Development

COCGW

-

Cleaning of Coke Oven Gas and Water (Project)

BAT

-

Best Available Technology

Steam from the quenching of hot coke at the quench tower

Esicongweni Environmental Services

COCGW RoD Audit Report

4

1. INTRODUCTION

ArcelorMittal South Africa Limited (AMSA) is the largest steel producer on the African continent. ArcelorMittal operates an integrated production facility north of the town of Vanderbijlpark, Gauteng (Figure 1). The plant has been operational since 1952 and the products are sold on both the local and international markets.

AMSA Vanderbijlpark Works (AMVW) embarked on a holistic integrated environmental study during the period 2000 to 2003 to obtain a better understanding of the environmental risks that the company faced. The main driver of the company's environmental improvement initiatives has been environmental legislation that was supported by environmental management systems certified in accordance with the ISO14001 standard.

An application for a Record of Decision (RoD) was lodged with the Gauteng Department of Agriculture, Conservation and Environment (GDACE) currently known as Gauteng Department of Agriculture and Rural Development (GDARD) to undertake the Coke Oven Clean Gas and Water Project activities. The application was lodged to fulfil the requirements of the Environmental Conservation Act (ECA; No 73 of 1989), which was then repealed and replaced by the National Environmental Management Act (NEMA; No 107 of 1998) (as amended), due to the proposed activity deemed to have a potential impact on the environment. The aim of the project was to improve the combustion efficiency of the coke oven gas and to mitigate air quality impacts arising from the combustion of un-cleaned coke oven gas.

The GDACE granted ISCOR Vanderbijlpark Steel (like AMSA was named in 2004) authorisation via a RoD with reference number Gaut 002/02-03/138 on 24 May 2004.

The RoD defined the project scope as follow:

  • Proposed Changes to Coke Ovens by-products Plant
  • Proposed Changes to the Gas Cleaning Line
  • Cleaning of Excess Process Water

The RoD authorised the activities under the following headings:

  • Modification of Gas Line 1
  • Primary Coolers - Gas Lines 3 & 4, and Gas Lines 6-9
  • Chilled Water Station/ Coo/Ing Water Supply Facilities
  • Installation of a New Pre-Decanter/ Modification of Tar Decanters
  • Installation of a Gravel Filter Unit
  • Upgrading of the Existing Ammonia Stills
  • Installation of the New Stripper/ De-acidifier System
  • Scrubbing Facilities -Gas Lines 3 & 4
  • Scrubbing Facilities - Gas Lines 6-9
  • Elementary Sulphur Plant combined with NH3 Cracking
  • Control System

There are Specific- and General Conditions in the RoD including Reporting Requirements.

Esicongweni Environmental Services (EES) was appointed by AMSA to undertake an external audit of conditions relating to this RoD.

Esicongweni Environmental Services

COCGW RoD Audit Report

5