Argosy Minerals Limited advised further progress at the Rincon Lithium Project, located in Salta Province, Argentina, with drilling works being conducted to source industrial groundwater supply for the commencement of 2,000tpa lithium carbonate production operations. During lithium carbonate production operations, processing water usage requirements are significantly reduced via recycling approximately 90% of the brine fed through the process plant, and is then returned to the natural salar (salt lake) in a balanced/neutral state. The water usage method will ensure there is nominal impact on people, animals or natural vegetation, and all raw water will be sourced from natural flows beneath the salar, which will otherwise evaporate naturally if not utilised, thus maintaining the equilibrium process at the salar.