Summary of Operations

For the three months ended March 31

2022

2021

Gold

Gold produced

Gold sold

Total

Total

All-In

Gold

Gold produced

Gold sold

Total

Total cash

All-In

produced

(000s ozs

(000s ozs

costs

cash

sustaining

produced

(000s ozs

(000s ozs

costs

costs

sustaining

(000s ozs

attributable

attributable

of sales

costs

costs

(000s ozs

attributable

attributable

of sales

($/oz)1

costs

100% basis)

share)

share)

($/oz)

($/oz)1

($/oz)1

100% basis)

share)

share)

($/oz)

($/oz)1

Carlin (61.5%)2

373

229

230

1,015

829

1,139

373

229

231

950

766

1,045

Cortez (61.5%)

187

115

118

1,113

784

1,150

163

100

102

1,251

860

1,203

Turquoise Ridge (61.5%)

109

67

64

1,436

1,030

1,281

149

92

92

1,007

647

741

Phoenix (61.5%)

37

23

21

2,253

835

1,027

41

25

24

2,051

346

530

Long Canyon (61.5%)

41

25

25

1,093

342

366

63

39

39

511

79

156

Nevada Gold Mines LLC (61.5%)3

747

459

458

1,169

820

1,118

789

485

488

1,047

686

932

Hemlo

31

31

31

1,727

1,503

1,982

47

47

47

1,610

1,324

1,840

North America

778

490

489

1,205

863

1,173

836

532

535

1,097

742

1,013

Pueblo Viejo (60%)

174

104

104

1,077

682

948

229

137

141

816

507

689

Veladero (50%)

92

46

39

1,348

847

1,588

64

32

31

1,151

736

2,104

Porgera (47.5%)4

-

-

-

-

-

-

-

-

-

-

-

-

Latin America & Asia Pacific

266

150

143

1,176

728

1,133

293

169

172

903

548

954

Loulo-Gounkoto (80%)

172

138

137

1,088

721

982

193

154

151

974

608

920

Kibali (45%)

168

76

73

1,137

744

996

192

86

86

1,065

691

856

Tongon (89.7%)

39

35

38

2,036

1,667

1,803

54

48

48

1,510

995

1,062

North Mara (84%)

66

56

58

852

709

874

74

62

56

1,061

832

1,038

Bulyanhulu (84%)

53

45

55

1,216

847

984

39

33

28

1,211

865

957

Buzwagi (84%)

-

-

-

-

-

-

20

17

17

1,486

1,450

1,467

Africa & Middle East

498

350

361

1,178

842

1,053

572

400

386

1,114

763

968

Total Gold

1,542

990

993

1,190

832

1,164

1,701

1,101

1,093

1,073

716

1,018

For the three months ended March 31

2022

2021

Copper

Copper

Copper sold

Total

C1 cash

All-In

Copper

Copper

Copper sold

Total

C1 cash

All-In

produced

produced (Mlbs

(Mlbs

costs of

costs

sustaining

produced

produced (Mlbs

(Mlbs

costs of

costs

sustaining

(Mlbs 100%

attributable

attributable

sales

($/lb)5

costs

(Mlbs 100%

attributable

attributable

sales

($/lb)5

costs

basis)

share)

share)

($/lb)

($/lb)5

basis)

share)

share)

($/lb)

($/lb)5

Zaldívar (50%)

51

25

26

2.85

2.15

2.64

48

24

27

3.03

2.25

2.47

Lumwana

57

57

70

2.20

1.86

3.16

51

51

69

1.97

1.48

2.37

Jabal Sayid (50%)

38

19

17

1.30

1.10

1.17

36

18

17

1.21

1.06

1.22

Total Copper

146

101

113

2.21

1.81

2.85

135

93

113

2.11

1.60

2.26

  • 1 Total cash costs per ounce and all-in sustaining costs per ounce are non-GAAP financial performance measures with no standard meaning under IFRS. For further information and reconciliation, please see endnote #1.

  • 2 These results include NGM's interest in South Arturo. On September 7, 2021, NGM announced it had entered into an Exchange Agreement with i-80 Gold to acquire the 40% interest in South Arturo that NGM did not already own in exchange for the Lone Tree and Buffalo Mountain properties and infrastructure. Operating results within our 61.5% interest in Carlin includes NGM's 60% interest in South Arturo up until May 30, 2021, and 100% interest thereafter, reflecting the terms of the Exchange Agreement which closed on October 14, 2021.

  • 3 These results represent our 61.5% interest in Carlin (including NGM's interest in South Arturo), Cortez, Turquoise Ridge, Phoenix and Long Canyon.

  • 4 On April 25, 2020, Porgera was placed on care and maintenance after the Government of Papua New Guinea communicated on April 24, 2020 that the Special Mining Lease would not be extended. Refer to our Q1 2022 Report for further information.

  • 5 C1 cash costs per pound and all-in sustaining costs per pound are non-GAAP financial performance measures with no standard meaning under IFRS. For further information, please see endnote #2.

1

MINE STATISTICS

Mine Statistics (Gold)

Carlin1 (61.5%)Cortez (61.5%)Turquoise Ridge (61.5%)Phoenix (61.5%)

Long Canyon

(61.5%)Nevada Gold Mines LLC (61.5%)2

Hemlo

For the three months ended March 31

2022

2021

2022

2021

2021

Tonnes mined (thousands)

18,634

18,898

17,895

20,923

211

3,569

6,361

6,822

2,330

3,945

45,431

54,157

330

319

Open Pit Ore

957

882

1,623

1,818

-

1,158

2,753

3,286

773

1,026

6,106

8,170

n/a

n/a

Open Pit Waste

16,841

17,215

15,994

18,800

-

2,215

3,608

3,536

1,557

2,919

38,000

44,685

n/a

n/a

Underground

836

801

278

305

211

196

n/a

n/a

n/a

n/a

1,325

1,302

330

319

Strip Ratio

17.60

19.52

9.85

10.34

n/a

1.91

1.31

1.08

2.02

2.85

6.22

5.47

n/a

n/a

Cost per tonne mined ($/tonne)3

Open Pit

2.32

2.02

2.67

1.90

n/a

2.66

2.72

2.29

2.72

2.18

2.54

2.06

n/a

n/a

Underground

105.34

95.66

101.96

75.82

168.18

145.85

n/a

n/a

n/a

n/a

114.65

98.56

115.45

127.65

Tonnes processed (thousands)

2,973

3,026

2,014

2,335

539

967

2,776

2,558

773

1,139

9,075

10,025

272

453

Oxide Mill

593

749

664

556

93

105

1,604

1,761

n/a

n/a

2,954

3,171

272

453

Roasters

1,122

1,058

272

339

n/a

n/a

n/a

n/a

n/a

n/a

1,394

1,397

n/a

n/a

Autoclave

540

525

n/a

n/a

446

668

n/a

n/a

n/a

n/a

986

1,193

n/a

n/a

Heap Leach

718

694

1,078

1,440

-

194

1,172

797

773

1,139

3,741

4,264

n/a

n/a

Cost per tonne processed ($/tonne)3

Oxide Mill

21.22

16.85

11.36

13.24

14.23

9.56

11.24

8.99

n/a

n/a

13.37

11.61

24.11

15.37

Roasters

27.72

24.12

27.51

37.85

n/a

n/a

n/a

n/a

n/a

n/a

27.68

27.44

n/a

n/a

Autoclave

43.90

48.23

n/a

n/a

60.28

28.06

n/a

n/a

n/a

n/a

51.30

36.97

n/a

n/a

Heap Leach

8.12

6.31

4.28

2.41

-

4.60

1.70

3.14

0.97

0.80

3.72

2.85

n/a

n/a

G&A cost per tonne processed ($/tonne)3

6.10

5.11

4.33

3.81

11.77

6.31

1.49

1.61

1.04

1.11

4.20

3.64

9.04

10.53

Average grade (grams per tonne)4

Open Pit mined

0.97

0.95

1.01

0.84

n/a

1.87

0.41

0.54

1.12

2.58

0.75

1.09

n/a

n/a

Underground mined

7.87

8.75

9.17

8.51

11.87

11.64

n/a

n/a

n/a

n/a

8.79

9.22

3.89

5.86

Processed

3.39

3.49

1.76

1.81

4.65

3.42

0.36

0.42

1.12

2.33

1.98

2.18

3.61

3.28

Recovery rate (percent)

77%

78%

80%

81%

79%

82%

70%

68%

n/a

n/a

77%

79%

95%

94%

Oxide Mill5

n/a

n/a

72%

77%

79%

87%

70%

68%

n/a

n/a

71%

74%

95%

94%

Roasters

85%

86%

87%

84%

n/a

n/a

n/a

n/a

n/a

n/a

85%

86%

n/a

n/a

Autoclave

46%

45%

n/a

n/a

79%

81%

n/a

n/a

n/a

n/a

65%

68%

n/a

n/a

Production (thousands of ounces)

229

229

115

100

67

92

23

25

25

39

459

485

31

47

Oxide Mill

9

7

35

36

3

5

23

23

n/a

n/a

70

71

31

47

Roasters

183

188

49

53

n/a

n/a

n/a

n/a

n/a

n/a

232

241

n/a

n/a

Autoclave

25

25

n/a

n/a

62

84

n/a

n/a

n/a

n/a

87

109

n/a

n/a

Heap Leach

12

9

31

11

2

3

n/a

2

25

39

70

64

n/a

n/a

Sales (thousands of ounces)

230

231

118

102

64

92

21

24

25

39

458

488

31

47

Cost of sales per ounce ($/oz)

1,015

950

1,113

1,251

1,436

1,007

2,253

2,051

1,093

511

1,169

1,047

1,727

1,610

Costs per ounce ($/oz)

Royalties and production taxes

33

24

104

72

-

-

-

-

-

-

43

27

143

313

Depreciation

185

182

323

388

402

342

523

518

750

432

305

298

202

275

Total cash costs6

829

766

784

860

1,030

647

835

346

342

79

820

686

1,503

1,324

All-in sustaining costs6

1,139

1,045

1,150

1,203

1,281

741

1,027

530

366

156

1,118

932

1,982

1,840

Capital expenditures ($ millions)7

Minesite sustaining6

69

61

41

33

16

9

3

4

-

2

130

113

13

22

Projects6

-

-

12

10

6

11

-

-

-

-

30

21

-

-

Total capital expenditures ($ millions)7

69

61

53

43

22

20

3

4

-

2

160

134

13

22

1 These results include NGM's interest in South Arturo. On September 7, 2021, NGM announced it had entered into an Exchange Agreement with i-80 Gold Corp. to acquire the 40% interest in South Arturo that NGM did not already own in exchange for the Lone Tree and Buffalo Mountain properties and infrastructure. Operating results within our 61.5% interest in Carlin includes NGM's 60% interest in South Arturo up until May 30, 2021, and 100% interest thereafter, reflecting the terms of the Exchange Agreement which closed on October 14, 2021.

  • 2 These results represent our 61.5% interest in Carlin (including NGM's interest in South Arturo), Cortez, Turquoise Ridge, Phoenix and Long Canyon.

  • 3 Cost per tonne mined ($/tonne), cost per tonne processed ($/tonne) and G&A cost per tonne processed ($/tonne) are supplementary financial measures. For further information please refer to endnote #4

  • 4 At Phoenix, stated grades relate to material slated for processing at the oxide mill.

  • 5 Excludes the Gold Quarry (Mill 5) concentrator.

  • 6 Total cash costs per ounce, all-in sustaining costs per ounce, minesite sustaining capital expenditures and project capital expenditures are non-GAAP financial performance measures with no standard meaning under IFRS. For further information please refer to endnotes #1 and #3.

7 Capital expenditures are presented on a cash basis and are reported at Barrick's share.

Mine Statistics (Gold)

Pueblo Viejo (60%)

Porgera (47.5%)1

For the three months ended March 31

2021

Veladero (50%)

2022

2022

2022

Tonnes mined (thousands)

4,318

6,636

7,886

9,550

-

-

Open Pit Ore

1,199

2,137

2,606

1,311

-

-

Open Pit Waste

3,119

4,499

5,280

8,239

-

-

Underground

n/a

n/a

n/a

n/a

-

-

Strip Ratio

2.60

2.11

2.03

6.28

-

-

Cost per tonne mined ($/tonne)2

Open Pit

3.43

2.59

4.15

2.89

-

-

Underground

n/a

n/a

n/a

n/a

-

-

Tonnes processed (thousands)

1,511

1,349

3,506

1,305

-

-

Autoclave

1,511

1,349

n/a

n/a

-

-

Heap Leach

n/a

n/a

3,506

1,305

-

-

Cost per tonne processed ($/tonne)2

Autoclave

36.42

37.06

n/a

n/a

-

-

Heap Leach

n/a

n/a

3.95

6.81

-

-

G&A cost per tonne processed ($/tonne)2

5.82

6.11

2.30

2.62

-

-

Average grade (grams per tonne)

Open Pit mined

2.46

2.46

0.80

0.78

-

-

Underground mined

n/a

n/a

n/a

n/a

-

-

Processed

2.47

3.55

0.67

0.85

-

-

Recovery rate (percent)

87%

88%

n/a

n/a

-

-

Autoclave

87%

88%

n/a

n/a

-

-

Production (thousands of ounces)

104

137

46

32

-

-

Autoclave

104

137

n/a

n/a

-

-

Heap Leach

n/a

n/a

46

32

-

-

Sales (thousands of ounces)

104

141

39

31

-

-

Cost of sales per ounce ($/oz)

1,077

816

1,348

1,151

-

-

Costs per ounce

Royalties and production taxes

62

60

176

205

-

-

Depreciation

333

263

481

369

-

-

Total cash costs3

682

507

847

736

-

-

All-in sustaining costs3

948

689

1,588

2,104

-

-

Capital expenditures ($ millions)4

Minesite sustaining3

26

24

28

41

-

-

Projects3

47

35

8

-

-

-

Total capital expenditures ($ millions)4

73

59

36

41

-

-

1 On April 25, 2020, Porgera was placed on care and maintenance after the Government of Papua New Guinea communicated on April 24, 2020 that the Special Mining Lease would not be extended. Refer to our Q1 2022 Report for further information.

2 Cost per tonne mined ($/tonne), cost per tonne processed ($/tonne) and G&A cost per tonne processed ($/tonne) are supplementary financial measures. For further information please refer to endnote #4.

3 Total cash costs per ounce, all-in sustaining costs per ounce, minesite sustaining capital expenditures and project capital expenditures are non-GAAP financial performance measures with no standard meaning under IFRS. For further information, please refer to endnotes #1 and #3.

4 Capital expenditures are presented on a cash basis and are reported at Barrick's share.

Mine Statistics (Gold)

For the three months ended March 31

Loulo-Gounkoto

(80%)Kibali (45%)Tongon (89.7%)

North Mara

(84%)Bulyanhulu

(84%)Buzwagi (84%)

2022

2022

2022

2022

2022

2022

2021

Tonnes mined (thousands)

9,325

9,009

3,806

3,409

9,514

6,573

1,412

248

231

125

-

n/a

Open Pit Ore

735

149

376

261

435

488

709

n/a

n/a

n/a

-

n/a

Open Pit Waste

7,797

8,313

3,079

2,694

9,079

6,085

379

n/a

n/a

n/a

-

n/a

Underground

793

547

351

454

n/a

n/a

324

248

231

125

-

n/a

Strip Ratio

10.61

55.79

8.19

10.32

20.87

12.47

0.53

n/a

n/a

n/a

-

n/a

Cost per tonne mined ($/tonne)1

Open Pit

3.07

3.00

3.51

3.64

3.22

3.34

6.83

n/a

n/a

n/a

-

n/a

Underground

41.92

52.55

55.98

39.11

n/a

n/a

57.09

76.14

98.38

101.41

-

n/a

Tonnes processed (thousands)

995

984

781

894

912

964

598

642

193

110

-

827

Cost per tonne processed ($/tonne)1

22.81

19.82

20.41

16.75

21.96

19.33

22.27

15.66

55.52

60.19

-

16.86

G&A cost per tonne processed ($/tonne)1

8.88

8.92

9.26

7.98

4.34

5.89

15.17

11.45

28.98

42.05

-

2.98

Average grade (grams per tonne)

Open Pit mined

1.73

2.82

1.43

2.55

1.56

2.25

2.13

n/a

n/a

n/a

-

n/a

Underground mined

4.91

4.61

5.88

5.18

n/a

n/a

5.84

3.94

8.25

9.78

-

n/a

Processed2

4.74

5.38

3.37

3.33

1.44

1.82

3.31

3.31

7.76

9.90

-

0.72

Recovery rate (percent)

91%

91%

89%

90%

83%

85%

88%

90%

92%

94%

-

87%

Production (thousands of ounces)

138

154

76

86

35

48

56

62

45

33

-

17

Sales (thousands of ounces)

137

151

73

86

38

48

58

56

55

28

-

17

Cost of sales per ounce ($/oz)

1,088

974

1,137

1,065

2,036

1,510

852

1,061

1,216

1,211

-

1,486

Costs per ounce

Royalties and production taxes

113

107

86

85

75

53

150

152

134

140

-

117

Depreciation

367

366

388

370

366

515

138

222

261

351

-

65

Total cash costs3

721

608

744

691

1,667

995

709

832

847

865

-

1,450

All-in sustaining costs3

982

920

996

856

1,803

1,062

874

1,038

984

957

-

1,467

Capital expenditures ($ millions)4

Minesite sustaining3

33

43

15

11

4

2

7

11

7

2

-

-

Projects3

18

12

4

-

-

-

11

5

4

9

-

-

Total capital expenditures ($ millions)4

51

55

19

11

4

2

18

16

11

11

-

-

1 Cost per tonne mined ($/tonne), cost per tonne processed ($/tonne) and G&A cost per tonne processed ($/tonne) are supplementary financial measures. For further information please refer to endnote #4.

  • 2 Includes stockpile processing for Buzwagi.

  • 3 Total cash costs per ounce, all-in sustaining costs per ounce, minesite sustaining capital expenditures and project capital expenditures are non-GAAP financial performance measures with no standard meaning under IFRS. For further information, please refer to endnotes #1 and #3.

4 Capital expenditures are presented on a cash basis and are reported at Barrick's share.

Mine Statistics (Copper)

Copper - Total

Lumwana

Zaldívar (50%)Jabal Sayid (50%)For the three months ended March 31

2022

2022

2022

2022

2021

Tonnes mined (thousands)

28,666

29,212

18,645

19,113

9,633

9,770

388

329

Open Pit Ore

9,752

11,458

4,566

6,357

5,186

5,101

n/a

n/a

Open Pit Waste

18,526

17,425

14,079

12,756

4,447

4,669

n/a

n/a

Underground

388

329

n/a

n/a

n/a

n/a

388

329

Strip Ratio

1.90

1.52

3.08

2.01

0.86

0.92

n/a

n/a

Tonnes processed (thousands)

9,776

11,107

5,785

6,355

3,636

4,413

355

339

Average grade

0.63%

0.62%

0.48%

0.44%

0.53%

0.52%

2.64%

2.68%

Recovery rate (percent)

94%

94%

94%

92%

n/a

n/a

93%

93%

Production (millions of pounds)

101

93

57

51

25

24

19

18

Sales (millions of pounds)

113

113

70

69

26

27

17

17

Cost of sales per pound ($/lb)

2.21

2.11

2.20

1.97

2.85

3.03

1.30

1.21

Costs per pound

C1 cash costs1

1.81

1.60

1.86

1.48

2.15

2.25

1.10

1.06

Depreciation

0.54

0.64

0.54

0.69

0.70

0.78

0.28

0.18

All-in sustaining costs1

2.85

2.26

3.16

2.37

2.64

2.47

1.17

1.22

Capital expenditures ($ millions)2

Minesite sustaining1

67

42

57

37

9

3

1

2

Projects1

8

11

-

-

6

11

2

-

Total capital expenditures ($ millions)2

75

53

57

37

15

14

3

2

1 C1 cash costs per pound, all-in sustaining costs per pound, minesite sustaining capital expenditures and project capital expenditures are non-GAAP financial performance measures with no standard meaning under IFRS. For further information, please refer to endnotes #2 and #3.

2 Capital expenditures are presented on a cash basis and are reported at Barrick's share.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Barrick Gold Corporation published this content on 02 May 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 04 May 2022 10:40:01 UTC.