For the three months ended March 31 | 2022 | 2021 | ||||||||||
Gold | Gold produced | Gold sold | Total | Total | All-In | Gold | Gold produced | Gold sold | Total | Total cash | All-In | |
produced | (000s ozs | (000s ozs | costs | cash | sustaining | produced | (000s ozs | (000s ozs | costs | costs | sustaining | |
(000s ozs | attributable | attributable | of sales | costs | costs | (000s ozs | attributable | attributable | of sales | ($/oz)1 | costs | |
100% basis) | share) | share) | ($/oz) | ($/oz)1 | ($/oz)1 | 100% basis) | share) | share) | ($/oz) | ($/oz)1 | ||
Carlin (61.5%)2 | 373 | 229 | 230 | 1,015 | 829 | 1,139 | 373 | 229 | 231 | 950 | 766 | 1,045 |
Cortez (61.5%) | 187 | 115 | 118 | 1,113 | 784 | 1,150 | 163 | 100 | 102 | 1,251 | 860 | 1,203 |
Turquoise Ridge (61.5%) | 109 | 67 | 64 | 1,436 | 1,030 | 1,281 | 149 | 92 | 92 | 1,007 | 647 | 741 |
Phoenix (61.5%) | 37 | 23 | 21 | 2,253 | 835 | 1,027 | 41 | 25 | 24 | 2,051 | 346 | 530 |
Long Canyon (61.5%) | 41 | 25 | 25 | 1,093 | 342 | 366 | 63 | 39 | 39 | 511 | 79 | 156 |
Nevada Gold Mines LLC (61.5%)3 | 747 | 459 | 458 | 1,169 | 820 | 1,118 | 789 | 485 | 488 | 1,047 | 686 | 932 |
Hemlo | 31 | 31 | 31 | 1,727 | 1,503 | 1,982 | 47 | 47 | 47 | 1,610 | 1,324 | 1,840 |
North America | 778 | 490 | 489 | 1,205 | 863 | 1,173 | 836 | 532 | 535 | 1,097 | 742 | 1,013 |
Pueblo Viejo (60%) | 174 | 104 | 104 | 1,077 | 682 | 948 | 229 | 137 | 141 | 816 | 507 | 689 |
Veladero (50%) | 92 | 46 | 39 | 1,348 | 847 | 1,588 | 64 | 32 | 31 | 1,151 | 736 | 2,104 |
Porgera (47.5%)4 | - | - | - | - | - | - | - | - | - | - | - | - |
Latin America & Asia Pacific | 266 | 150 | 143 | 1,176 | 728 | 1,133 | 293 | 169 | 172 | 903 | 548 | 954 |
Loulo-Gounkoto (80%) | 172 | 138 | 137 | 1,088 | 721 | 982 | 193 | 154 | 151 | 974 | 608 | 920 |
Kibali (45%) | 168 | 76 | 73 | 1,137 | 744 | 996 | 192 | 86 | 86 | 1,065 | 691 | 856 |
Tongon (89.7%) | 39 | 35 | 38 | 2,036 | 1,667 | 1,803 | 54 | 48 | 48 | 1,510 | 995 | 1,062 |
North Mara (84%) | 66 | 56 | 58 | 852 | 709 | 874 | 74 | 62 | 56 | 1,061 | 832 | 1,038 |
Bulyanhulu (84%) | 53 | 45 | 55 | 1,216 | 847 | 984 | 39 | 33 | 28 | 1,211 | 865 | 957 |
Buzwagi (84%) | - | - | - | - | - | - | 20 | 17 | 17 | 1,486 | 1,450 | 1,467 |
Africa & Middle East | 498 | 350 | 361 | 1,178 | 842 | 1,053 | 572 | 400 | 386 | 1,114 | 763 | 968 |
Total Gold | 1,542 | 990 | 993 | 1,190 | 832 | 1,164 | 1,701 | 1,101 | 1,093 | 1,073 | 716 | 1,018 |
For the three months ended March 31 | 2022 | 2021 | ||||||||||
Copper | Copper | Copper sold | Total | C1 cash | All-In | Copper | Copper | Copper sold | Total | C1 cash | All-In | |
produced | produced (Mlbs | (Mlbs | costs of | costs | sustaining | produced | produced (Mlbs | (Mlbs | costs of | costs | sustaining | |
(Mlbs 100% | attributable | attributable | sales | ($/lb)5 | costs | (Mlbs 100% | attributable | attributable | sales | ($/lb)5 | costs | |
basis) | share) | share) | ($/lb) | ($/lb)5 | basis) | share) | share) | ($/lb) | ($/lb)5 | |||
Zaldívar (50%) | 51 | 25 | 26 | 2.85 | 2.15 | 2.64 | 48 | 24 | 27 | 3.03 | 2.25 | 2.47 |
Lumwana | 57 | 57 | 70 | 2.20 | 1.86 | 3.16 | 51 | 51 | 69 | 1.97 | 1.48 | 2.37 |
Jabal Sayid (50%) | 38 | 19 | 17 | 1.30 | 1.10 | 1.17 | 36 | 18 | 17 | 1.21 | 1.06 | 1.22 |
Total Copper | 146 | 101 113 2.21 1.81 2.85 135 | 93 113 2.11 1.60 2.26 |
1 Total cash costs per ounce and all-in sustaining costs per ounce are non-GAAP financial performance measures with no standard meaning under IFRS. For further information and reconciliation, please see endnote #1.
2 These results include NGM's interest in South Arturo. On September 7, 2021, NGM announced it had entered into an Exchange Agreement with i-80 Gold to acquire the 40% interest in South Arturo that NGM did not already own in exchange for the Lone Tree and Buffalo Mountain properties and infrastructure. Operating results within our 61.5% interest in Carlin includes NGM's 60% interest in South Arturo up until May 30, 2021, and 100% interest thereafter, reflecting the terms of the Exchange Agreement which closed on October 14, 2021.
3 These results represent our 61.5% interest in Carlin (including NGM's interest in South Arturo), Cortez, Turquoise Ridge, Phoenix and Long Canyon.
4 On April 25, 2020, Porgera was placed on care and maintenance after the Government of Papua New Guinea communicated on April 24, 2020 that the Special Mining Lease would not be extended. Refer to our Q1 2022 Report for further information.
5 C1 cash costs per pound and all-in sustaining costs per pound are non-GAAP financial performance measures with no standard meaning under IFRS. For further information, please see endnote #2.
1
MINE STATISTICS
Mine Statistics (Gold)
Carlin1 (61.5%)Cortez (61.5%)Turquoise Ridge (61.5%)Phoenix (61.5%)
Long Canyon
(61.5%)Nevada Gold Mines LLC (61.5%)2
Hemlo
For the three months ended March 31 | 2022 | 2021 2022 2021 | 2021 |
Tonnes mined (thousands) | 18,634 | 18,898 | 17,895 | 20,923 | 211 | 3,569 | 6,361 | 6,822 | 2,330 | 3,945 | 45,431 | 54,157 | 330 | 319 |
Open Pit Ore | 957 | 882 | 1,623 | 1,818 | - | 1,158 | 2,753 | 3,286 | 773 | 1,026 | 6,106 | 8,170 | n/a | n/a |
Open Pit Waste | 16,841 | 17,215 | 15,994 | 18,800 | - | 2,215 | 3,608 | 3,536 | 1,557 | 2,919 | 38,000 | 44,685 | n/a | n/a |
Underground | 836 | 801 | 278 | 305 | 211 | 196 | n/a | n/a | n/a | n/a | 1,325 | 1,302 | 330 | 319 |
Strip Ratio | 17.60 | 19.52 | 9.85 | 10.34 | n/a | 1.91 | 1.31 | 1.08 | 2.02 | 2.85 | 6.22 | 5.47 | n/a | n/a |
Cost per tonne mined ($/tonne)3 | ||||||||||||||
Open Pit | 2.32 | 2.02 | 2.67 | 1.90 | n/a | 2.66 | 2.72 | 2.29 | 2.72 | 2.18 | 2.54 | 2.06 | n/a | n/a |
Underground | 105.34 | 95.66 | 101.96 | 75.82 | 168.18 | 145.85 | n/a | n/a | n/a | n/a | 114.65 | 98.56 | 115.45 | 127.65 |
Tonnes processed (thousands) | 2,973 | 3,026 | 2,014 | 2,335 | 539 | 967 | 2,776 | 2,558 | 773 | 1,139 | 9,075 | 10,025 | 272 | 453 |
Oxide Mill | 593 | 749 | 664 | 556 | 93 | 105 | 1,604 | 1,761 | n/a | n/a | 2,954 | 3,171 | 272 | 453 |
Roasters | 1,122 | 1,058 | 272 | 339 | n/a | n/a | n/a | n/a | n/a | n/a | 1,394 | 1,397 | n/a | n/a |
Autoclave | 540 | 525 | n/a | n/a | 446 | 668 | n/a | n/a | n/a | n/a | 986 | 1,193 | n/a | n/a |
Heap Leach | 718 | 694 | 1,078 | 1,440 | - | 194 | 1,172 | 797 | 773 | 1,139 | 3,741 | 4,264 | n/a | n/a |
Cost per tonne processed ($/tonne)3 | ||||||||||||||
Oxide Mill | 21.22 | 16.85 | 11.36 | 13.24 | 14.23 | 9.56 | 11.24 | 8.99 | n/a | n/a | 13.37 | 11.61 | 24.11 | 15.37 |
Roasters | 27.72 | 24.12 | 27.51 | 37.85 | n/a | n/a | n/a | n/a | n/a | n/a | 27.68 | 27.44 | n/a | n/a |
Autoclave | 43.90 | 48.23 | n/a | n/a | 60.28 | 28.06 | n/a | n/a | n/a | n/a | 51.30 | 36.97 | n/a | n/a |
Heap Leach | 8.12 | 6.31 | 4.28 | 2.41 | - | 4.60 | 1.70 | 3.14 | 0.97 | 0.80 | 3.72 | 2.85 | n/a | n/a |
G&A cost per tonne processed ($/tonne)3 | 6.10 | 5.11 | 4.33 | 3.81 | 11.77 | 6.31 | 1.49 | 1.61 | 1.04 | 1.11 | 4.20 | 3.64 | 9.04 | 10.53 |
Average grade (grams per tonne)4 | ||||||||||||||
Open Pit mined | 0.97 | 0.95 | 1.01 | 0.84 | n/a | 1.87 | 0.41 | 0.54 | 1.12 | 2.58 | 0.75 | 1.09 | n/a | n/a |
Underground mined | 7.87 | 8.75 | 9.17 | 8.51 | 11.87 | 11.64 | n/a | n/a | n/a | n/a | 8.79 | 9.22 | 3.89 | 5.86 |
Processed | 3.39 | 3.49 | 1.76 | 1.81 | 4.65 | 3.42 | 0.36 | 0.42 | 1.12 | 2.33 | 1.98 | 2.18 | 3.61 | 3.28 |
Recovery rate (percent) | 77% | 78% | 80% | 81% | 79% | 82% | 70% | 68% | n/a | n/a | 77% | 79% | 95% | 94% |
Oxide Mill5 | n/a | n/a | 72% | 77% | 79% | 87% | 70% | 68% | n/a | n/a | 71% | 74% | 95% | 94% |
Roasters | 85% | 86% | 87% | 84% | n/a | n/a | n/a | n/a | n/a | n/a | 85% | 86% | n/a | n/a |
Autoclave | 46% | 45% | n/a | n/a | 79% | 81% | n/a | n/a | n/a | n/a | 65% | 68% | n/a | n/a |
Production (thousands of ounces) | 229 | 229 | 115 | 100 | 67 | 92 | 23 | 25 | 25 | 39 | 459 | 485 | 31 | 47 |
Oxide Mill | 9 | 7 | 35 | 36 | 3 | 5 | 23 | 23 | n/a | n/a | 70 | 71 | 31 | 47 |
Roasters | 183 | 188 | 49 | 53 | n/a | n/a | n/a | n/a | n/a | n/a | 232 | 241 | n/a | n/a |
Autoclave | 25 | 25 | n/a | n/a | 62 | 84 | n/a | n/a | n/a | n/a | 87 | 109 | n/a | n/a |
Heap Leach | 12 | 9 | 31 | 11 | 2 | 3 | n/a | 2 | 25 | 39 | 70 | 64 | n/a | n/a |
Sales (thousands of ounces) | 230 | 231 | 118 | 102 | 64 | 92 | 21 | 24 | 25 | 39 | 458 | 488 | 31 | 47 |
Cost of sales per ounce ($/oz) | 1,015 | 950 | 1,113 | 1,251 | 1,436 | 1,007 | 2,253 | 2,051 | 1,093 | 511 | 1,169 | 1,047 | 1,727 | 1,610 |
Costs per ounce ($/oz) | ||||||||||||||
Royalties and production taxes | 33 | 24 | 104 | 72 | - | - | - | - | - | - | 43 | 27 | 143 | 313 |
Depreciation | 185 | 182 | 323 | 388 | 402 | 342 | 523 | 518 | 750 | 432 | 305 | 298 | 202 | 275 |
Total cash costs6 | 829 | 766 | 784 | 860 | 1,030 | 647 | 835 | 346 | 342 | 79 | 820 | 686 | 1,503 | 1,324 |
All-in sustaining costs6 | 1,139 | 1,045 | 1,150 | 1,203 | 1,281 | 741 | 1,027 | 530 | 366 | 156 | 1,118 | 932 | 1,982 | 1,840 |
Capital expenditures ($ millions)7 | ||||||||||||||
Minesite sustaining6 | 69 | 61 | 41 | 33 | 16 | 9 | 3 | 4 | - | 2 | 130 | 113 | 13 | 22 |
Projects6 | - | - | 12 | 10 | 6 | 11 | - | - | - | - | 30 | 21 | - | - |
Total capital expenditures ($ millions)7 | 69 | 61 | 53 | 43 | 22 | 20 | 3 | 4 | - | 2 | 160 | 134 | 13 | 22 |
1 These results include NGM's interest in South Arturo. On September 7, 2021, NGM announced it had entered into an Exchange Agreement with i-80 Gold Corp. to acquire the 40% interest in South Arturo that NGM did not already own in exchange for the Lone Tree and Buffalo Mountain properties and infrastructure. Operating results within our 61.5% interest in Carlin includes NGM's 60% interest in South Arturo up until May 30, 2021, and 100% interest thereafter, reflecting the terms of the Exchange Agreement which closed on October 14, 2021.
2 These results represent our 61.5% interest in Carlin (including NGM's interest in South Arturo), Cortez, Turquoise Ridge, Phoenix and Long Canyon.
3 Cost per tonne mined ($/tonne), cost per tonne processed ($/tonne) and G&A cost per tonne processed ($/tonne) are supplementary financial measures. For further information please refer to endnote #4
4 At Phoenix, stated grades relate to material slated for processing at the oxide mill.
5 Excludes the Gold Quarry (Mill 5) concentrator.
6 Total cash costs per ounce, all-in sustaining costs per ounce, minesite sustaining capital expenditures and project capital expenditures are non-GAAP financial performance measures with no standard meaning under IFRS. For further information please refer to endnotes #1 and #3.
7 Capital expenditures are presented on a cash basis and are reported at Barrick's share.
Mine Statistics (Gold) | |
Pueblo Viejo (60%) | Porgera (47.5%)1 |
For the three months ended March 31 | 2021 |
Veladero (50%)
2022 | 2022 | 2022 |
Tonnes mined (thousands) | 4,318 | 6,636 | 7,886 | 9,550 | - | - |
Open Pit Ore | 1,199 | 2,137 | 2,606 | 1,311 | - | - |
Open Pit Waste | 3,119 | 4,499 | 5,280 | 8,239 | - | - |
Underground | n/a | n/a | n/a | n/a | - | - |
Strip Ratio | 2.60 | 2.11 | 2.03 | 6.28 | - | - |
Cost per tonne mined ($/tonne)2 | ||||||
Open Pit | 3.43 | 2.59 | 4.15 | 2.89 | - | - |
Underground | n/a | n/a | n/a | n/a | - | - |
Tonnes processed (thousands) | 1,511 | 1,349 | 3,506 | 1,305 | - | - |
Autoclave | 1,511 | 1,349 | n/a | n/a | - | - |
Heap Leach | n/a | n/a | 3,506 | 1,305 | - | - |
Cost per tonne processed ($/tonne)2 | ||||||
Autoclave | 36.42 | 37.06 | n/a | n/a | - | - |
Heap Leach | n/a | n/a | 3.95 | 6.81 | - | - |
G&A cost per tonne processed ($/tonne)2 | 5.82 | 6.11 | 2.30 | 2.62 | - | - |
Average grade (grams per tonne) | ||||||
Open Pit mined | 2.46 | 2.46 | 0.80 | 0.78 | - | - |
Underground mined | n/a | n/a | n/a | n/a | - | - |
Processed | 2.47 | 3.55 | 0.67 | 0.85 | - | - |
Recovery rate (percent) | 87% | 88% | n/a | n/a | - | - |
Autoclave | 87% | 88% | n/a | n/a | - | - |
Production (thousands of ounces) | 104 | 137 | 46 | 32 | - | - |
Autoclave | 104 | 137 | n/a | n/a | - | - |
Heap Leach | n/a | n/a | 46 | 32 | - | - |
Sales (thousands of ounces) | 104 | 141 | 39 | 31 | - | - |
Cost of sales per ounce ($/oz) | 1,077 | 816 | 1,348 | 1,151 | - | - |
Costs per ounce | ||||||
Royalties and production taxes | 62 | 60 | 176 | 205 | - | - |
Depreciation | 333 | 263 | 481 | 369 | - | - |
Total cash costs3 | 682 | 507 | 847 | 736 | - | - |
All-in sustaining costs3 | 948 | 689 | 1,588 | 2,104 | - | - |
Capital expenditures ($ millions)4 | ||||||
Minesite sustaining3 | 26 | 24 | 28 | 41 | - | - |
Projects3 | 47 | 35 | 8 | - | - | - |
Total capital expenditures ($ millions)4 | 73 | 59 | 36 | 41 | - | - |
1 On April 25, 2020, Porgera was placed on care and maintenance after the Government of Papua New Guinea communicated on April 24, 2020 that the Special Mining Lease would not be extended. Refer to our Q1 2022 Report for further information.
2 Cost per tonne mined ($/tonne), cost per tonne processed ($/tonne) and G&A cost per tonne processed ($/tonne) are supplementary financial measures. For further information please refer to endnote #4.
3 Total cash costs per ounce, all-in sustaining costs per ounce, minesite sustaining capital expenditures and project capital expenditures are non-GAAP financial performance measures with no standard meaning under IFRS. For further information, please refer to endnotes #1 and #3.
4 Capital expenditures are presented on a cash basis and are reported at Barrick's share.
Mine Statistics (Gold)
For the three months ended March 31
Loulo-Gounkoto
(80%)Kibali (45%)Tongon (89.7%)
North Mara
(84%)Bulyanhulu
(84%)Buzwagi (84%)
2022 | 2022 | 2022 | 2022 | 2022 | 2022 |
2021
Tonnes mined (thousands) | 9,325 | 9,009 | 3,806 | 3,409 | 9,514 | 6,573 | 1,412 | 248 | 231 | 125 | - | n/a |
Open Pit Ore | 735 | 149 | 376 | 261 | 435 | 488 | 709 | n/a | n/a | n/a | - | n/a |
Open Pit Waste | 7,797 | 8,313 | 3,079 | 2,694 | 9,079 | 6,085 | 379 | n/a | n/a | n/a | - | n/a |
Underground | 793 | 547 | 351 | 454 | n/a | n/a | 324 | 248 | 231 | 125 | - | n/a |
Strip Ratio | 10.61 | 55.79 | 8.19 | 10.32 | 20.87 | 12.47 | 0.53 | n/a | n/a | n/a | - | n/a |
Cost per tonne mined ($/tonne)1 | ||||||||||||
Open Pit | 3.07 | 3.00 | 3.51 | 3.64 | 3.22 | 3.34 | 6.83 | n/a | n/a | n/a | - | n/a |
Underground | 41.92 | 52.55 | 55.98 | 39.11 | n/a | n/a | 57.09 | 76.14 | 98.38 | 101.41 | - | n/a |
Tonnes processed (thousands) | 995 | 984 | 781 | 894 | 912 | 964 | 598 | 642 | 193 | 110 | - | 827 |
Cost per tonne processed ($/tonne)1 | 22.81 | 19.82 | 20.41 | 16.75 | 21.96 | 19.33 | 22.27 | 15.66 | 55.52 | 60.19 | - | 16.86 |
G&A cost per tonne processed ($/tonne)1 | 8.88 | 8.92 | 9.26 | 7.98 | 4.34 | 5.89 | 15.17 | 11.45 | 28.98 | 42.05 | - | 2.98 |
Average grade (grams per tonne) | ||||||||||||
Open Pit mined | 1.73 | 2.82 | 1.43 | 2.55 | 1.56 | 2.25 | 2.13 | n/a | n/a | n/a | - | n/a |
Underground mined | 4.91 | 4.61 | 5.88 | 5.18 | n/a | n/a | 5.84 | 3.94 | 8.25 | 9.78 | - | n/a |
Processed2 | 4.74 | 5.38 | 3.37 | 3.33 | 1.44 | 1.82 | 3.31 | 3.31 | 7.76 | 9.90 | - | 0.72 |
Recovery rate (percent) | 91% | 91% | 89% | 90% | 83% | 85% | 88% | 90% | 92% | 94% | - | 87% |
Production (thousands of ounces) | 138 | 154 | 76 | 86 | 35 | 48 | 56 | 62 | 45 | 33 | - | 17 |
Sales (thousands of ounces) | 137 | 151 | 73 | 86 | 38 | 48 | 58 | 56 | 55 | 28 | - | 17 |
Cost of sales per ounce ($/oz) | 1,088 | 974 | 1,137 | 1,065 | 2,036 | 1,510 | 852 | 1,061 | 1,216 | 1,211 | - | 1,486 |
Costs per ounce | ||||||||||||
Royalties and production taxes | 113 | 107 | 86 | 85 | 75 | 53 | 150 | 152 | 134 | 140 | - | 117 |
Depreciation | 367 | 366 | 388 | 370 | 366 | 515 | 138 | 222 | 261 | 351 | - | 65 |
Total cash costs3 | 721 | 608 | 744 | 691 | 1,667 | 995 | 709 | 832 | 847 | 865 | - | 1,450 |
All-in sustaining costs3 | 982 | 920 | 996 | 856 | 1,803 | 1,062 | 874 | 1,038 | 984 | 957 | - | 1,467 |
Capital expenditures ($ millions)4 | ||||||||||||
Minesite sustaining3 | 33 | 43 | 15 | 11 | 4 | 2 | 7 | 11 | 7 | 2 | - | - |
Projects3 | 18 | 12 | 4 | - | - | - | 11 | 5 | 4 | 9 | - | - |
Total capital expenditures ($ millions)4 | 51 | 55 | 19 | 11 | 4 | 2 | 18 | 16 | 11 | 11 | - | - |
1 Cost per tonne mined ($/tonne), cost per tonne processed ($/tonne) and G&A cost per tonne processed ($/tonne) are supplementary financial measures. For further information please refer to endnote #4.
2 Includes stockpile processing for Buzwagi.
3 Total cash costs per ounce, all-in sustaining costs per ounce, minesite sustaining capital expenditures and project capital expenditures are non-GAAP financial performance measures with no standard meaning under IFRS. For further information, please refer to endnotes #1 and #3.
4 Capital expenditures are presented on a cash basis and are reported at Barrick's share.
Mine Statistics (Copper)
Copper - Total
Lumwana
Zaldívar (50%)Jabal Sayid (50%)For the three months ended March 31
2022 | 2022 | 2022 | 2022 |
2021
Tonnes mined (thousands) | 28,666 | 29,212 | 18,645 | 19,113 | 9,633 | 9,770 | 388 | 329 |
Open Pit Ore | 9,752 | 11,458 | 4,566 | 6,357 | 5,186 | 5,101 | n/a | n/a |
Open Pit Waste | 18,526 | 17,425 | 14,079 | 12,756 | 4,447 | 4,669 | n/a | n/a |
Underground | 388 | 329 | n/a | n/a | n/a | n/a | 388 | 329 |
Strip Ratio | 1.90 | 1.52 | 3.08 | 2.01 | 0.86 | 0.92 | n/a | n/a |
Tonnes processed (thousands) | 9,776 | 11,107 | 5,785 | 6,355 | 3,636 | 4,413 | 355 | 339 |
Average grade | 0.63% | 0.62% | 0.48% | 0.44% | 0.53% | 0.52% | 2.64% | 2.68% |
Recovery rate (percent) | 94% | 94% | 94% | 92% | n/a | n/a | 93% | 93% |
Production (millions of pounds) | 101 | 93 | 57 | 51 | 25 | 24 | 19 | 18 |
Sales (millions of pounds) | 113 | 113 | 70 | 69 | 26 | 27 | 17 | 17 |
Cost of sales per pound ($/lb) | 2.21 | 2.11 | 2.20 | 1.97 | 2.85 | 3.03 | 1.30 | 1.21 |
Costs per pound | ||||||||
C1 cash costs1 | 1.81 | 1.60 | 1.86 | 1.48 | 2.15 | 2.25 | 1.10 | 1.06 |
Depreciation | 0.54 | 0.64 | 0.54 | 0.69 | 0.70 | 0.78 | 0.28 | 0.18 |
All-in sustaining costs1 | 2.85 | 2.26 | 3.16 | 2.37 | 2.64 | 2.47 | 1.17 | 1.22 |
Capital expenditures ($ millions)2 | ||||||||
Minesite sustaining1 | 67 | 42 | 57 | 37 | 9 | 3 | 1 | 2 |
Projects1 | 8 | 11 | - | - | 6 | 11 | 2 | - |
Total capital expenditures ($ millions)2 | 75 | 53 | 57 | 37 | 15 | 14 | 3 | 2 |
1 C1 cash costs per pound, all-in sustaining costs per pound, minesite sustaining capital expenditures and project capital expenditures are non-GAAP financial performance measures with no standard meaning under IFRS. For further information, please refer to endnotes #2 and #3.
2 Capital expenditures are presented on a cash basis and are reported at Barrick's share.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Barrick Gold Corporation published this content on 02 May 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 04 May 2022 10:40:01 UTC.