BHP-WAIO- Network Incident Statistics
FY Year Quarter Date Required Date Submitted Regulation 30(1)(a) Regulation 30(1)(a) Regulation 30(1)(a) Regulation 30(1)(a) Regulation 30(1)(b) Regulation 30(1)(c) Regulation 30(1)(d) Regulation 30(1)(e) Regulation 30(1)(f) Regulation 30(1)(f) Regulation 30(1)(f) Regulation 30(1)(g) Regulation 30(1)(h) Regulation 30(1)(i) Regulation 31(3) Regulation 31(3) Regulation 31(3)
Electric Shock No Injury Electric Shock Injury Electric Shock Fatality Electric Shock Livestock Fatality Property Damage (Not Fire) Property Damage (Fire) Wood Pole Fire Conductor Clashing Unassisted Wood Pole Failure Unassisted Steel Pole Failure Unassisted Concrete Pole Failure Unassisted Conductor Failure Unassisted Stay Failure Unassisted Cable Failure Unassisted 3 yr avg Pole Failure Rate/10,000 Wood pole 3 year rolling average rate Steel pole 3 year rolling average rate PERIOD TO REPORT
Q3 27-Oct-15 10-Nov-16 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0
2015 Q4 29-Feb-16 10-Nov-16 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0
2016 Q1 27-May-16 10-Nov-16 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0
Q2 26-Aug-16 10-Nov-16 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0
0.000 0.002 0.002 0.002 0.002 0.000 N/A 0.000 N/A 0.002 0.002 0.002 0.000 0.000
Total 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0
Objective 30 0 0 0 0 5 N/A 2 N/A 0 0 0 1 4
2017 Q3 25-Nov-16 04-Jan-18 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 JULY-SEP
2016 Q4 1-Mar-17 04-Jan-18 0 0 0 0 0 0 N/A 0 N/A 0 0 1 0 0 OCT-DEC
2017 Q1 1-Jun-17 04-Jan-18 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 JAN-MAR
Q2 25-Aug-17 04-Jan-18 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 APRIL-JUNE
0.002 0.002 0.002 0.002 0.002 0.002 0.001 0.002 0.001 0.002 0.002 1.100 0.002 0.002
Total 0 0 0 0 0 0 N/A 0 N/A 0 0 1 0 0
Objective 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0
2018 Q3 24-Nov-17 04-Jan-18 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 JULY-SEP
2017 Q4 26-Feb-18 09-Feb-18 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 OCT-DEC
2018 Q1 30-May-18 14-May-18 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 JAN-MAR
Q2 24-Aug-18 14-Aug-18 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 APRIL-JUNE
0.002 0.002 0.002 0.002 0.002 0.002 0.001 0.002 0.001 0.002 0.002 0.002 0.002 0.002
Total 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0
Objective 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0
2019 Q3 23-Nov-18 12-Nov-18 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 JULY-SEP
2018 Q4 26-Feb-19 12-Feb-19 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 OCT-DEC
2019 Q1 30-May-19 12-May-19 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 JAN-MAR
Q2 26-Aug-19 13-Aug-19 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 APRIL-JUNE
Total 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0
Objective 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0
2020 Q3 26-Nov-19 12-Nov-19 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 JULY-SEP
2019 Q4 26-Feb-20 12-Feb-20 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 OCT-DEC
2020 Q1 30-May-20 13-May-20 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 JAN-MAR
Q2 25-Aug-20 16-Oct-20 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0 APRIL-JUNE
Total 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0
Objective 0 0 0 0 0 0 N/A 0 N/A 0 0 0 0 0
FY Year Quarter Date Required Date Submitted Regulation 30(1)(a) Regulation 30(1)(a) Regulation 30(1)(a) Regulation 30(1)(a) Regulation 30(1)(b) Regulation 30(1)(c) Regulation 30(1)(d) Regulation 30(1)(e) Regulation 30(1)(f) Regulation 30(1)(g) Regulation 30(1)(h) Regulation 30(1)(i) Regulation 31(3) Regulation 31(3) Regulation 31(3)
Electric Shock No Injury Electric Shock Injury Electric Shock Fatality Electric Shock Livestock Fatality Property Damage (Not Fire) Property Damage (Fire) Pole Fire Conductor Clashing Unassisted Pole Failure Unassisted Overhead Conductor Failure Unassisted Stay Wire Failure Unassisted Underground Cable Failure Unassisted 3 yr avg Pole Failure Rate/10,000 Wood pole 3 year rolling average rate Steel pole 3 year rolling average rate PERIOD TO REPORT
2021 Q3 25-Nov-20 25-Nov-20 0 0 0 0 0 0 1
Sukri, Kai: Sukri, Kai: CPT-MAC81 Pole Fire Event. Steel Pole*. 11 Aug 2020.
0 0 0 0 0 JULY-SEP
2020 Q4 26-Feb-21 25-Feb-21 0 0 0 0 0 0 0 0 0 0 0 2
Vercoe, Marieka: Vercoe, Marieka: 1) 07/11/20 - Mines Distribution - 11kV Paperled cable failure 2)16/12/20 - Town Distribution - 11kV Paperled cable failure
OCT-DEC
2021 Q1 31-May-21 27-May-21 1
Vercoe, Marieka: Vercoe, Marieka: 1) Electrical Inspector advised Final Report has been submitted to the Regulator

Sukri, Kai: Sukri, Kai: CPT-MAC81 Pole Fire Event. Steel Pole*. 11 Aug 2020.

Vercoe, Marieka: Vercoe, Marieka: 1) 07/11/20 - Mines Distribution - 11kV Paperled cable failure 2)16/12/20 - Town Distribution - 11kV Paperled cable failure
0 0 0 0 0 0 0 0 0 0 1
Vercoe, Marieka: Vercoe, Marieka: 1) 415V unassisted cable fault between pole and pillar in Newman Township
JAN-MAR
Q2 25-Aug-21 18-Aug-21 0 0 0 0 0 0 0 0 0 0 0 0 APRIL-JUNE
Total 1 0 0 0 0 0 1 0 0 0 0 3
Objective 0 0 0 0 0 0 0 0 0 0 0 0
2022 Q3 25-Nov-21 11-Nov-21 0 0 0 0 0 0 0 0 0 0 0 0 JULY-SEP
2021 Q4 28-Feb-22 OCT-DEC
2022 Q1 23-May-22 JAN-MAR
Q2 25-Aug-22 APRIL-JUNE
Total 0 0 0 0 0 0 0 0 0 0 0 0
Objective
2023 Q3 25-Nov-22 JULY-SEP
2022 Q4 27-Feb-23 OCT-DEC
2023 Q1 31-May-23 JAN-MAR
Q2 25-Aug-23 APRIL-JUNE
Total
Objective
2024 Q3 24-Nov-23 JULY-SEP
2023 Q4 26-Feb-24 OCT-DEC
2024 Q1 28-May-24 JAN-MAR
Q2 23-Aug-24 APRIL-JUNE
Total
Objective
2025 Q3 25-Nov-24 JULY-SEP
2024 Q4 26-Feb-25 OCT-DEC
2025 Q1 29-May-25 JAN-MAR
Q2 25-Aug-25 APRIL-JUNE
Total
Objective
Sheet2
Sheet3

Attachments

  • Original document
  • Permalink

Disclaimer

BHP Group Limited published this content on 14 November 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 15 November 2021 08:29:04 UTC.