Biocartis Group NV reported that a fire broke out at one of the Company’s warehouse facilities in Mechelen, Belgium, during the night of 30 July 2021. No one was injured and all Biocartis staff on the site were safe. While the fire incident caused considerable damage to the warehouse facility and raw materials stock, the production line (‘ML2’) located in the affected building was not damaged. Production will however be disrupted because of the structural damage to the building from both the fire as well as the water damage from the fire extinguishing efforts. Biocartis is now assessing the impact on production continuity from the lost raw materials and preparing a plan to maximize the transfer of production from production line ‘ML2’ in the affected building to production line ‘ML1’, which is located in another building at the Mechelen site. In addition, the Company is evaluating options to source raw materials from different suppliers in order to minimize production delay.