Blackrock Silver Corp. announced new high-grade silver and gold drill intercepts from its core and RC drilling program on the 100% controlled Tonopah West project located in the Walker Lane trend of Western Nevada. These new results continue to demonstrate robust continuity of high-grade mineralization at both the DPB and Victor targets; additional in-fill drill results highlight world-class potential for this deposit as the company works towards delivery of a maiden resource estimate. Six +1-kilogram/tonne silver equivalent (AgEq) intercepts reported across both the DPB and Victor target areas; Denver vein returned 7.4 metres grading 2.0 g/t Au and 181 g/t Ag or 381 g/t AgEq including 1.5 metres grading 5.5 g/t Au and 487 g/t Ag or 1,034 g/t AgEq in TXC21-017 (AgEq=silver: gold ratio 100:1), and TXC21-016 returned 3.3 metres grading 2.25 g/t Au and 223 g/t Ag or 448 g/t AgEq including 0.5 metres yielding 1,046 g/t AgEq (5.52 g/t Au and 494 g/t Ag) from the Denver vein; Drilling on the Victor vein returned three +1-kilogram intercepts. Drillhole TW21-085 returned 1.6 metres grading 1,289 g/t AgEq (7.22 g/t Au and 577 g/t Ag); TW21-097C cut 6.5 metres yielding 456 g/t AgEq (1.94 g/t Au and 261.3 g/t Ag) including 1.6 metres grading 1,181 g/t AgEq (5.26 g/t Au and 655 g/t Ag) and another intercept returning 8.1 metres grading 300 g/t AgEq (1.07 g/t Au and 192.9 g/t Ag); The Victor/Murray vein also returned 1.7 metres grading 1,053 g/t AgEq (3.93 Au and 660 g/t Ag) in the Victor target; Mine Development Associates, a division of RESPEC, have been engaged and will soon commence work on delivering a maiden resource estimate on the DPB target at Tonopah West; and The DPB in-fill drill program is on track for completion at the end of September. Assays for 32 drillholes are currently pending. Core drilling continues to deliver world-class silver and gold intercepts with infill results now demonstrating robust continuity of high-grade mineralization throughout the DPB target area. The area hosts six veins with a cumulative high-grade strike in excess of 4 kilometres over significant widths and mineralized shoots measuring several hundred metres vertically. The Denver vein continues to deliver intercepts along strike and down dip. Core holes TXC21-016 and - 017 returned wide zone of high-grade gold and silver. TXC21-016 cut the Denver vein at 477.4 metres and returned 3.3 metres grading 448 g/t AgEq (2.25 g/t Au and 222.7 g/t Ag) including a 0.5 metre zone with 1046 g/t AgEq (5.52 Au and 494 Ag). Core TXC21-017 cut the Denver vein higher and returned 7.4 metres grading 381 g/t AgEq (2 g/t Au and 180.6 g/t Ag) including a 1.5 metre zone of 1,034 g/t AgEq (5.46 g/t Au and 487.3 g/t Ag). Core hole TXC21-015 also intersected the Denver, Mule and Paymaster veins, with an intercept above the 200 g/t AgEq cut-off encountered in the Paymaster vein with 479 g/t AgEq (2.19 Au and 260 g/t Ag) over 1.3 metres. Two previously unknown veins were also cut and returned 1.4 metres grading 198.8 g/t AgEq (0.78 g/t Au and 120.5 g/t Ag) and 1.0 metres grading 537 g/t AgEq (2.4 g/t Au and 297 g/t Ag). TXC21-007 intercepted the Merton vein which was 2.4 metres thick, but the intercepts were below the reported cut off grade. Similarly, TXC21-013 intersected the Denver vein with three intercepts ranging from 1.2 to 1.5 metres thick. Following up on the exciting results from drillhole TX21-006, which cut 7.281 g/t gold and 511 g/t silver over 3.5 metres (which included 21.86 g/t gold and 1,355 g/t silver over 0.9 metres) on the Bermuda vein, drilling along strike is progressing at this time with six drillholes either in progress or with assays pending - TXC21-022, -023, -024, -031, -032 and -033. Assays are pending for 22 core holes and 10 RC drillholes. The project has three core drills and one RC drilling operating 24 hours per day, 7 days per week. The proposed DPB in-fill drill program is on track for completion at the end of September. Assay results have slowed to a 10 week turn-around time from the date submitted. The Company ships samples weekly from Tonopah to the assay lab in Sparks, Nevada. More than 84,000 metres of drilling has been completed since June 15, 2020, and a total of approximately 57,000 metres has been completed year-to-date. The 2021 program is approximately 75% complete and is utilizing three diamond core drills and one reverse circulation drill. The core drills are focused on the DPB resource delineation while the RC drill continues to drill pre-collar holes, pull casing and drilling exploration holes on the margin of the resource evaluation area. The DPB resource definition program consists of 40,000 metres of diamond core drilling from 20 drill sites within this large multi-vein target. This broad multi-vein, high-grade system sits within an area measuring 800 by 800 metres. Drilling to date has identified two new veins bringing the total to six veins within the DPB. The 2021 drill program will focus on delineating a resource across this area. Mine Development Associates, a division of RESPEC, has been engaged and will soon commence work on tabulating a maiden resource estimate with delivery expected by the first quarter of 2022.