Bam Bam Resources Corp. announced that a contract has been signed with Boart Longyear to drill at the Majuba Hill Porphyry Copper Project in Pershing County Nevada. Drill plans call for 2468 to3353 meters (8000 to 11,000 feet) in 11-15 reverse-circulation holes. The drilling is focused on expanding copper mineralization identified in previous drilling. Bam Bam field personnel and contractors will continue to use operational health and safety protocols consistent with ensuring the health and safety of company people and the local community. The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. The samples are transported directly to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are drill duplicates and copper-gold-porphyry commercial standard reference material pulps. The sample rejects and remaining pulps will be retrieved from ALS.