Log in
E-mail
Password
Show password
Remember
Forgot password ?
Become a member for free
Sign up
Sign up
New member
Sign up for FREE
New customer
Discover our services
Settings
Settings
Dynamic quotes 
OFFON
  1. Homepage
  2. Equities
  3. Sweden
  4. Nasdaq Stockholm
  5. Boliden AB
  6. News
  7. Summary
    BOL   SE0012455673

BOLIDEN AB

(BOL)
SummaryChartsNewsRatingsCalendarCompany 
SummaryMost relevantAll NewsOther languagesPress ReleasesOfficial PublicationsSector newsMarketScreener Strategies

Boliden : Production stop in Tara

11/24/2021 | 03:10am EST

Production in Tara Mines has been stopped due to increased water flows into the mine. The increased water flow resulted from drilling of a pilot raisbore hole for a ventilation shaft. Underground production is not considered possible at this time.

Whilst drilling a pilot raise bore hole for a 1km ventilation shaft, a high flow of water into the mine was encountered, which caused production to be stopped. Inflow volumes are exceeding the capacity of the dewatering infrastructure. The production has been stopped to focus on protecting infrastructure and equipment, whilst also eliminating unnecessary addition of water into the mine. Initiatives have been initiated to stop the flow of water from the pilot raise bore hole. It is at present unclear how long the stop in production will be.

Disclaimer

Boliden AB published this content on 24 November 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 24 November 2021 08:09:06 UTC.


ę Publicnow 2021
All news about BOLIDEN AB
2021Boliden Sustains $11 Million Of Damages Amid Slag Explosion At Nickel Smelter
MT
2021Nickel production at Harjavalta stopped due to slag explosion
AQ
2021Nickel Production at Harjavalta Stopped Due to Slag Explosion
CI
2021Boliden signs agreement with Metso Outotec regarding expansion of Odda
AQ
2021Boliden AB Signs Agreement with Metso Outotec Regarding Expansion of Odda
CI
2021Production in Tara partially resumed
AQ
2021Boliden AB Announces That Production in Tara Partially Resumed
CI
2021Water flows into the Tara mine stopped
AQ
2021BOLIDEN : Production stop in Tara
PU
2021LKAB Minerals - LKAB and Boliden collaborate to recycle mining waste and create circula..
AQ
More news
Chart BOLIDEN AB
Duration : Period :
Boliden AB Technical Analysis Chart | MarketScreener
Full-screen chart
Managers and Directors
Mikael Staffas President & Chief Executive Officer
Hňkan Gabrielsson Chief Financial Officer
Anders Gerhard Ullberg Chairman
Gustaf Michael L÷w Independent Director
Tom Erixon Independent Director
Sector and Competitors