Boralex Inc. announced the commissioning of three wind farms for a total capacity of 53 MW. Boralex has an operating capacity of 1.1 GW in France and 2.5 GW worldwide. The wind farms are located in the commune of Louville-la-Chenard, in the Eure-et-Loir department of the Centre-Val de Loire region of France. These commissionings relate to the repowering of two existing wind farms with six wind turbines each and the construction of an extension with seven turbines. The three projects were executed simultaneously and overseen by Boralex's teams. Together, they will produce approximately 138 GWh per year, sufficient to meet the energy needs of some 60,000 French households. Repowering of the Remise de Réclainville wind farm: Commissioning date: May 9, 2022, Wind turbines: 6 Nordex N117. Total capacity after repowering: 14 MW. Repowering of the Evits et Josaphat wind farm: Commissioning date: June 24, 2022, Wind turbines: 6 NordexN117, Total capacity after repowering: 14 MW. Bois des Fontaines wind farm: Commissioning date: May 12, 2022, Wind turbines: 7 Nordex N117, Total capacity: 25 MW.