Brigadier Gold Limited commenced preparations for inaugural exploration program at Gold-Silver Picachos Property Sinaloa Mexico, Including First - Ever Diamond Drilling Program Focused at Past Producing San - Agustin High Grade Gold Mine Brigadier Gold Limited announced preparations are underway for the first ever diamond drill campaign at the Company's recently acquired 3,954 hectare Picachos Gold-Silver Property, centered over the historic "Viva Zapata" National Mineral Reserve, Sinaloa, Mexico. Drilling is expected to commence in September and is planned for a minimum 5000 meters in approximately 40 holes targeting four high-grade gold-silver veins. Drill Targets: San Agustin mine: underground channel sampling by prior operator returned average grade of 81.22 grams per ton (g/t) gold (Au) and 73.36 g/t silver (Ag) across 1.2 m. Values of 185 g/t Au were cut across the bottom of a production shaft. Mochomos vein: historic rock chip-channel sample 26409 yielded a result of 18.5 g/t Au and 570 g/t Ag across approximately 0.5 m. Los Tejones vein with values of 28.6 g/t Au, and 114 g/t Ag across approximately a meter . Fermin vein with values of 268 ppm Ag and 0.3 g/t Au across 1 m.