Highlights
- LM-21-219 drilled 31m of 272 g/t Silver, 0.05% Cobalt from 117.8m depth
- Including 8m 860 g/t Silver, 0.17% Cobalt
- Including 4m of 1186 g/t Silver, 0.28% Cobalt
- LM-21-214 drilled 8m of 370 g/t Silver, 0.02% Cobalt from 118.1m depth
- including 1m of 1345 g/t Silver, 0.04% Cobalt
Chairman and CEO of Brixton,
Click link for Figure 1. Location Maps of the Shaft 6 Area Drilling,
https://brixtonmetals.com/wp/wp-content/uploads/2021/03/Figure-1_24March2021.jpg
Table 1. Drilling Highlights from Holes LM-21-214 to LM-21-219.
Hole ID | From (m) | To (m) | Interval (m) | Ag (g/t) | Co (%) | Ag (g/t * m) |
LM-21-214 | 118.10 | 126.10 | 8.00 | 370.82 | 0.02 | 2966.60 |
including | 120.10 | 121.10 | 1.00 | 1345.00 | 0.04 | 1345.00 |
LM-21-217 | 119.60 | 121.60 | 2.00 | 158.05 | - | 316.10 |
LM-21-218 | 121.80 | 122.80 | 1.00 | 274.00 | - | 274.00 |
LM-21-218 | 134.80 | 139.80 | 5.00 | 65.50 | 0.18 | 327.50 |
including | 137.80 | 138.80 | 1.00 | 146.00 | 0.84 | 146.00 |
LM-21-218 | 177.80 | 178.80 | 1.00 | 164.00 | 0.01 | 164.00 |
LM-21-219 | 117.80 | 148.80 | 31.00 | 272.16 | 0.05 | 8436.90 |
including | 135.80 | 139.80 | 4.00 | 1186.00 | 0.28 | 4744.00 |
including | 137.80 | 138.80 | 1.00 | 2160.00 | 0.84 | 2160.00 |
including | 135.80 | 143.80 | 8.00 | 859.66 | 0.17 | 6877.30 |
including | 141.80 | 142.80 | 1.00 | 1490.00 | 0.18 | 1490.00 |
Intervals represent drilled lengths, as the true widths of the mineralization have not been determined at this time.
Click here for Figure 2. Long-section Shaft 3 to Shaft 6 Area,
https://brixtonmetals.com/wp/wp-content/uploads/2021/03/Figure-2_24March2021.jpg
Click here for Figure 3. Shaft 6 Drilling Area Cross-section,
https://brixtonmetals.com/wp/wp-content/uploads/2021/03/Figure-3_24March2021.jpg
Click here for Figure 4. Core Photographs of Silver-Cobalt Mineralization from Holes 218 and 219:
https://brixtonmetals.com/wp/wp-content/uploads/2021/03/Figure-4_24March2021.jpg
Click here for Figure 5. Drilling Cross-section East Shaft 3 Area:
https://brixtonmetals.com/wp/wp-content/uploads/2021/03/Figure-5_24March2021.jpg
Quality Assurance & Quality Control
Diamond drill holes were drilled with NQ size core. Samples were collected using 1m average sample length. Three quality control samples (one blank, one standard and one duplicate) were inserted into each batch of 20 samples. The drill core was cut in half and put in batches, sealed and shipped by the Company geologists to ALS Minerals preparation lab in
About the
Brixton’s wholly owned
Mr.
About
Brixton is a Canadian exploration and development company focused on the advancement of its mining projects toward feasibility. Brixton wholly owns four exploration projects, the Thorn copper-gold-silver Project, the Atlin Goldfields Projects located in NWBC, the Langis-HudBay silver-cobalt Project in
On Behalf of the Board of Directors
Mr.
Tel: 604-630-9707 or email: info@brixtonmetals.com
For Investor Relations, please contact:
Tel: 604-630-9707 or email: mitchell.smith@brixtonmetals.com
Neither the
Information set forth in this news release may involve forward-looking statements under applicable securities laws. Forward-looking statements are statements that relate to future, not past, events. In this context, forward-looking statements often address expected future business and financial performance, and often contain words such as “anticipate”, “believe”, “plan”, “estimate”, “expect”, and “intend”, statements that an action or event “may”, “might”, “could”, “should”, or “will” be taken or occur, including statements that address potential quantity and/or grade of minerals, potential size and expansion of a mineralized zone, proposed timing of exploration and development plans, or other similar expressions. All statements, other than statements of historical fact included herein including, without limitation, statements regarding the use of proceeds. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the following risks: the need for additional financing; operational risks associated with mineral exploration; fluctuations in commodity prices; title matters; and the additional risks identified in the annual information form of the Company or other reports and filings with the TSXV and applicable Canadian securities regulators. Forward-looking statements are made based on management’s beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change, except as required by applicable securities laws. Investors are cautioned against attributing undue certainty to forward-looking statements.
Figures accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/8378b589-8100-4ef0-8295-46cc82767543
https://www.globenewswire.com/NewsRoom/AttachmentNg/ed43bee5-152c-4ce7-9b77-25a3e2137f84
https://www.globenewswire.com/NewsRoom/AttachmentNg/49efe481-1454-4541-8111-5de226fee565
https://www.globenewswire.com/NewsRoom/AttachmentNg/38a461c2-f5a4-4d36-b8e1-4e42a8668ca0
https://www.globenewswire.com/NewsRoom/AttachmentNg/7dc8413c-7031-4ebc-8c22-99ee87f870aa
Figure 1
Location Maps of the Shaft 6 Area Drilling, Langis Project
Figure 2
Long-section Shaft 3 to Shaft 6 Area, Langis Project
Figure 3
Shaft 6 Drilling Area Cross-section, Langis Project
Figure 4
Core Photographs of Silver-Cobalt Mineralization from Holes 218 and 219
Figure 5
Drilling Cross-section East Shaft 3 Area
2021 GlobeNewswire, Inc., source