Brookside Energy Limited provided an update on operations from Brookside's second well in the SWISH Area of Interest (AOI) in the world-class Anadarko Basin, the high-impact Rangers 36-25 SXH 1 Well (Rangers Well). During the last 24 hours the intermediate casing was successfully set and cemented at the designed depth and the Rangers Well curve was subsequently landed as planned at a measured depth of 10,260 feet in the target formation (Sycamore). As at December 29, 2021, operations were underway to trip out of the hole to pick-up the assembly required for drilling of the lateral portion of the wellbore. Drilling operations are proceeding on schedule, safely and without incident.