ASX Announcement

30 July 2019

Adoxa 1 - Weekly drilling report

Buru Energy Limited (Buru Energy) provides the following update on operations at the Adoxa 1 exploration well as at 0600 hours Tuesday 30 July 2019.

Since the last report, the well has been drilled ahead in 216 mm (8½ inch) hole with the casing while drilling system to a section depth of 646 metres where slow drilling was encountered and the 178 mm (7 inch) surface casing was then cemented in place.

The current operation is preparing to run in the hole to commence drilling the 152 mm (6

ASX: BRU

inch) hole through the objective reservoir sections.

The weekly drilling progress report for the well is attached.

Visit www.buruenergy.comfor information on Buru Energy's current and future activities.

For investor inquiries please contact Buru Energy:

Telephone: +61 8 9215 1800

Freecall: 1800 337 330

Email: info@buruenergy.com

Qualified Petroleum Resources Evaluator Statement

Except where otherwise noted, information in this release related to exploration and production results and petroleum resources is based on information compiled by Eric Streitberg who is an employee of Buru Energy Limited. Mr Streitberg is a Fellow of the Australian Institute of Mining and Metallurgy and the Australian Institute of Company Directors, and a member and Certified Petroleum Geologist of the American Association of Petroleum Geologists. He has over 40 years of relevant experience. Mr Streitberg consents to the inclusion of the information in this document.

1

Level 2, 16 Ord St West Perth WA 6005

1800 337 330

info@buruenergy.com

ABN 71 130 651 437

Weekly Well Operations Report - Adoxa 1

The Adoxa 1 well is located in Exploration License EP428 in the

Permit

Canning Basin of northwestern

Western Australia. The well is

located 120 kms east of Broome and 20 kms northeast of the

Ungani oilfield.

Well Surface Location

Latitude: 17° 55' 44.6641"S

Northing: 8,017,628 mN

Longitude: 123° 20' 34.9175"E

Easting: 536,329 mE

Buru Energy's Interest

Buru Energy Limited holds a 50% interest in the well and in EP428

and is the operator of the permit and the well.

Date of Progress Report

30 July 2019 (AWST)

Proposed Total Depth

+/- 2,400 metres MDRT

Current Depth

646 metres

Commencement Date

24 July 2019

Days Since Commencement

6 days

The objective of the well is conventional oil in potentially stacked

Reeves Formation clastic reservoirs in a similar section to where oil

Target Formation

was recovered at the Ungani Far West 1 well. The Anderson

Formation clastic reservoirs are a deeper secondary conventional oil

target below 1,800 metres.

Since the last report, the well has been drilled ahead in 216 mm

Operations Since Last Progress

(8½ inch) hole with the casing while drilling system to a section

Report

depth of 646 metres where slow drilling was encountered and the

178 mm (7 inch) surface casing was then cemented in place.

Hydrocarbons Indications

None - None expected.

The current operation is preparing to run in the hole to commence

Forward Operations

drilling the 152 mm (6 inch) hole through the objective reservoir

sections.

2

Level 2, 16 Ord St West Perth WA 6005

1800 337 330

info@buruenergy.com

ABN 71 130 651 437

3

Level 2, 16 Ord St West Perth WA 6005

1800 337 330

info@buruenergy.com

ABN 71 130 651 437

Attachments

  • Original document
  • Permalink

Disclaimer

Buru Energy Ltd. published this content on 30 July 2019 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 30 July 2019 15:24:09 UTC