Egypt Western Desert Information Pack

June 2021

CNE Egypt Western Desert

Introduction

  • Cairn is pre-releasing the CPR from the circular in order to help analysts assess the proposed acquisition
  • The reserves, resources, production projections and cost profiles within the CPR and presentation are consistent with the information published when the proposed acquisition was announced on 9 March 2021, supplemented with annual 2C production profiles and associated costs based on Cairn preliminary estimates
  • As previously guided, actual production in March 2021 is expected to be in the range of 33,000 - 38,000 boepd as a result of reduced drilling activity during 2020 and 2021 compared to historical levels; more detailed guidance on the expected near term ramp up in production will be provided following completion of the proposed acquisition
  • All numbers are Cairn Working Interest unless otherwise stated
  • The report's scope considers a five year investment programme across the assets from 2020-2024 only; thereafter it projects decline curves, although the history of the assets is one of continued infill drilling, development and exploration activity that has sustained production levels over an extended period
  • The presentation also includes Cairn's current view of the exploration prospectivity, prior to acquiring and/or re- processing new seismic on several concessions

Egypt Western Desert Information Pack, June 2021

2

CNE Egypt Western Desert

Western Desert Asset Map

Egypt Western Desert Information Pack, June 2021

3

CNE Egypt Western Desert

Key Producing Areas

Existing production areas

Obaiyed

(includes Obaiyed and NUMB)

Cheiron 50%

Cairn 50%

NEAG

(includes NEAG Tiba and NEAG Extension)

Cheiron

Cairn

Apache

Sinopec

26%

26%

32%

16%

Near term developments

NM

(located in Obaiyed area)

Cheiron 50%

Cairn 50%

BED

(includes BED fields and Sitra)

Cheiron 50%

Cairn 50%

AESW

Cheiron

Cairn

Zhenhua

Neptune

20%

20%

35%

25%

NAES

(located in BED area)

Cheiron 50%

Cairn 50%

4

Egypt Western Desert Information Pack, June 2021

CNE Egypt Western Desert

Historic Production

Historic Production by Production Area

60

50

40

Mboepd

30

20

10

0

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Obaiyed Area

BED Area

NEAG Area

AESW

Historic Production by Hydrocarbon Type

60

50

40

Mboepd

30

20

10

0

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

Oil Gas

Egypt Western Desert Information Pack, June 2021

5