Ausenco's work has identified several opportunities with the potential to lower initial capital expenditures ('CapEx') and operating expenses ('OpEx') while also enhancing our environmental, social and governance ('ESG') practices.
Summary of Significant Developments
Mitigation of the need for a roaster, both for a smaller and a larger project, which could significantly reduce both CapEx and OpEx costs and improve ESG practices; The potential viability of the project at various concentrator throughputs including 40,000; 50,000 and 60,000 tonnes per day ('tpd'); Evaluation of a staged expansion with a smaller throughput for a lower initial CapEx, then expanding after payback using mine cash flow indicates this could be an attractive development strategy; The application of the best available technology ('BAT') for tailings that considers both wet and dry stack tailings storage methodologies which could improve ESG practices and appears viable. This should be assessed in more detail.
'The potential mitigation of a roaster is a game changer, offering an opportunity to significantly reduce both CapEx and OpEx and enabling an operation less complicated both for permitting and day-to-day operations. This opportunity was identified as a result of new geometallurgical modelling of the deposit and updated smelting costs,' stated
Signficant historical engineering work has been completed for the
Ausenco has a 30-year track record and is recognised as specialists in end-to-end solutions which are proven to lower capital and operating costs, reduce construction time and improve plant efficiencies. They perform consulting studies, project delivery, and asset operations to the international mining sector including high performance copper processing and infrastructure projects. Project experience ranges from small conceptual studies for new developments through to the construction of large scale minerals processing facilities.
About
The Technical Reports, referred to above, are based on a throughput rate of 95,000 tpd producing 260M lb Cu/year which resulted in post-tax NPVs and IRRs of
This news release may contain forward-looking statements including but not limited to comments regarding timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.
Contact:
Email: info@candentecopper.com
Web: www.candentecopper.com
(C) 2021 Electronic News Publishing, source