Egypt Western Desert

Information pack: 2021 actuals and 2022 guidance

March 2022

Section title

Disclaimer

These materials contain forward-looking statements regarding Capricorn, our corporate plans, future financial condition, future results of operations, future business plans and strategies. All such forward-looking statements are based on our management's assumptions and beliefs in the light of information available to them at this time.

These forward-looking statements are, by their nature, subject to significant risks and uncertainties and actual results, performance and achievements may be materially different from those expressed in such statements. Factors that may cause actual results, performance or achievements to differ from expectations include, but are not limited to, regulatory changes, future levels of industry product supply, demand and pricing, weather and weather related impacts, wars and acts of terrorism, development and use of technology, acts of competitors and other changes to business conditions.

Capricorn undertakes no obligation to revise any such forward-looking statements to reflect any changes in Capricorn's expectations with regard thereto or any change in circumstances or events after the date hereof.

Egypt Western Desert information pack March 2022

2

Egypt Western Desert Information Pack

Egypt 2021 production actuals

AESW

Obaiyed

NUMB BED Area

NEAG

Area

NM

NAES

TOTAL

Production

Production/day - WI, average from completion

boe/d

12,290

1,210

14,680

2,160

6,130

0

0

36,470

Entitlement production/day

boe/d

4,580

490

5,890

1,080

2,460

0

0

14,500

Opex

Opex / boe

US$/boe

3.7

5.0

7.0

14.6

4.8

0.0

0.0

6.0

Capex

Capex

US$m

1.2

0.0

10.4

1

2.5

0.0

0.4

15.4

Total production oil versus gas

Oil

Production/day - WI, average from completion

boe/d

1,930

80

9,190

1,530

1,200

0

0

13,930

Entitlement production/day

boe/d

600

40

3,450

770

490

0

0

5,350

Gas

Production/day - WI, average from completion

scf/d

58,194

6,326

30,820

3,508

27,733

0

0

126,580

Production/day - WI, average from completion

boe/d

10,360

1,130

5,490

630

4,930

0

0

22,540

Entitlement production/day

boe/d

3,980

450

2,440

310

1,970

0

0

9,150

Figures represent actual production metrics in respect of Egypt asset portfolio from acquisition (23 September 2021) to 31 December 2021

Egypt Western Desert information pack March 2022

3

Egypt Western Desert Information Pack

Egypt 2022 production guidance

Indicative split by area based on mid case of 37,000 to 43,000 boe/d production and $90-110m capex guidance

Obaiyed

NUMB

BED Area

NEAG

AESW Area

NM

NAES

TOTAL

Production

Production/day - WI

boe/d

12,150

1,390

17,600

2,410

6,450

0

0

40,000

Entitlement production/day*

boe/d

4,430

510

6,420

890

2,350

0

0

14,600

Opex

Opex / boe

US$/boe

4.0

0.0

4.3

16.6

4.2

0.0

0.0

5.2

Capex

Capex

US$m

21.2

0.2

47.7

10.7

9.1

0.0

8.1

97.0

Total production oil versus gas

Oil

Production/day - WI

boe/d

1,820

70

11,310

1,870

1,500

0

0

16,570

Entitlement production/day

boe/d

660

20

4,120

690

550

0

0

6,040

Gas

Production/day - WI

scf/d

57,840

7,410

35,220

3,020

27,750

0

0

131,240

Production/day - WI

boe/d

10,330

1,320

6,290

540

4,950

0

0

23,430

Entitlement production/day

boe/d

3,770

490

2,300

200

1,800

0

0

8,560

  • Entitlement interest calculation based on a ~$1.5/bbl oil price discount to an average Brent price of $76.5/bbl for the year, and fixed price gas of ~$2.9/mcf, in addition to assumption for modelling purposes that 75% of opex is expensed, 20% is capitalised and 5% is non-cost recoverable.

Egypt Western Desert information pack March 2022

4

Head Office

London

50 Lothian Road

4th Floor

Edinburgh

Wellington House

EH3 9BY

125 Strand

T: +44 131 475 3000

London

F: +44 131 475 3030

WC2R 0AP

  1. pr@capricornenergy.com

Mexico

Egypt

Mauritania

Capricorn Americas México

Capricorn Egypt Limited

Ilot C 544

Torre Mayor

5th Floor

Tevragh Zeina

Avienda de la Reforma 505

7 Road 150

Nouakchott

Piso 36

114431 Maadi

Colonia Cuauhtémoc

Cairo

Delegación Cuauhtémoc

06500 Ciudad de México

www.capricornenergy.com