ASX ANNOUNCEMENT

26 July 2022

ASX:CMM

EXCELLENT RESULTS RETURNED FROM RESOURCE DRILLING AT BOTH MT GIBSON AND KARLAWINDA

Highlights

Mt Gibson Gold Project (MGGP)

  • A total of 80,124 metres (514 holes) of planned 81,000 metre RC resource definition and extension drilling programme completed to the end of June 2022.
  • Assays received from 280 holes since the last update (first 55 holes) in April 2022 continue to return exceptional results within and extensional to the resource including:

Outside current resource

4 metres @ 118.74g/t from 142 to 146m

35 metres @ 1.55g/t from 200 to 235m

10 metres @ 6.08g/t from 48 to 58m

5 metres @ 8.09g/t from 199 to 204m

12 metres @ 3.44g/t from 78 to 90m

10 metres @ 4.07g/t from 85 to 95m

24 metres @ 2.27g/t from 256 to 280m

16 metres @ 2.52g/t from 202 to 218m

Within current resource

16 metres @ 3.15g/t from 170 to 186m

17 metres @ 3.61g/t from 37 to 54m

20 metres @ 2.72g/t from 107 to 127m

5 metres @ 17.23g/t from 79 to 84m

11 metres @ 6.75g/t from 98 to 109m

34 metres @ 2.93g/t from 121 to 155m

10 metres @ 4.48g/t from 58 to 68m

12 metres @ 6.85g/t from 144 to 156m

  • Drilling on the unmined Saratoga and Orion North trends (east of the main Gibson trend) has defined zones of better grade within the resource shell and extending below the resource shell.
  • Capricorn has expanded the programme from 81,000m to 105,000m in order to follow up and extend strong results returned both within and outside current resource optimisation shells.
  • Results from this extended programme of drilling will be included in the updated Mineral Resource Estimate (MRE) in September 2022 and maiden Ore Reserve Estimate (ORE) in October 2022.
  • In an important step for development of the project, Capricorn's application for a mining lease over the area required for a mining operation has been granted for an initial term of 21 years.
  • 30,000 metres first pass regional exploration AC and RC drilling across a number of high priority target areas to commence in the September 2022 quarter.

Karlawinda Gold Project (KGP)

  • 23,664 metres (109 holes) of a planned 30,000m resource infill and extension RC drilling programme completed to the end of June 2022.
  • Assays have been returned from 51 holes with encouraging gold results including:

10 metres @ 5.04g/t from 99 to 109m*

18 metres @ 1.36g/t from 197 to 215m*

3 metres @ 11.16g/t from 169 to 172m*

26 metres @ 1.19g/t from 168 to 194m

22 metres @ 1.20g/t from 152 to 174m

6 metres @ 4.36g/t from 54 to 60m

18 metres @ 1.40g/t from 140 to 158m

26 metres @ 0.97g/t from 175 to 201m*

* intercept outside the current 2020 MRE

For personal use only

  • High grade intercepts have been returned near the base of, below and along strike of current resource pit optimisations, which remain open down dip and south along strike.
  • Results to form part of update to the Karlawinda MRE targeted for September 2022 and ORE in October 2022.
  • A 30,000 metre regional exploration AC programme commenced in July 2022 following up AC gold anomalies adjacent to the shear zone at Mundiwindi and surface geochemical anomalies at Jim's East, Renaissance and Forfar prospects.
  • A 3,010 metre RC programme planned to commence at the Muirfield prospect in the current quarter following up mineralisation reported in the December 2021 quarter.

Capricorn Executive Chairman Mark Clark commented:

"Exceptional results from resource definition and extensional drilling at Mt Gibson are continuing to point to the quality and growth potential of the resource there. We made the obvious decision to extend the programme by at least another 24,000 metres given the strength of results within and below the current resource shells. We are excited by the potential of Mt Gibson to become Capricorn's second gold mine. We also continue to return strong results from the resource infill and extensional drill programme at Karlawinda. These two critical drill programmes will culminate in resource and reserve studies for both projects and are expected to underpin the delivery of Capricorn's organic growth strategy."

MGGP - RC drilling at Lexington Pit (Looking North)

2

For personal use only

Mt Gibson

Infill and Extensional RC Drilling

In January 2022 two RC rigs commenced drilling a planned 81,000 metre drill programme across the 8 kilometres of strike of current resources at the Company's 100% owned Mt Gibson Gold Project (MGGP).

The objectives of this programme included:

  • Infill drilling of the resource to broadly bring the drill density to 25 x 25 metres;
  • Test gaps between resource pit optimisation shells along the 8 kilometres of strike; and
  • Test for extensions of gold mineralisation below the current resource shells.

Early results from this drilling were announced in April 2022 based on the first 29,842 metres of drilling. To the end of June 2022 a further 50,282 metres of drilling has been completed taking the total drilling to 80,124 metres. Following a review of very encouraging ongoing results Capricorn has extended the programme to 105,000 metres to continue testing strong extensional areas.

The 514 holes (80,124 metres) completed to date have mainly focussed on the Orion Mine Trend, one of the more significant areas of the 2.08 million ounce resource at MGGP.

Figure 1. Drilling progress over the MGGP 8km long mine trend & MRE pit crests

3

For personal use only

Assays have now been received from the first 335 holes (46,342 metres). Assays received from 280 holes since the last update continue to return very encouraging results including:

Hole No

Easting

Northing

From (m)

To (m)

Width (m)

Grade (g/t Au)

CMRC052

516230.61

6709301.76

170

186

16

3.15

CMRC058

516241.54

6709551.45

107

127

20

2.72

CMRC063

516287.49

6709700.24

78

107

29

1.56

CMRC071

516448.02

6709996.06

79

84

5

17.23

CMRC078

516553.44

6709843.35

98

109

11

6.75

CMRC0101*

516504.82

6709631.304

78

90

12

3.44

CMRC0138

516354.23

6705274.023

121

155

34

2.93

CMRC0182*

516380.9

6705223.34

142

146

4

118.74

CMRC0202

515996.7

6706408.138

54

62

8

5.99

CMRC1014

516349.79

6709023.71

69

77

8

5.25

CMRC1016*

516399.85

6709047.41

199

204

5

8.09

CMRC1017

516322.22

6709399.38

59

78

19

2.62

CMRC1017*

516322.22

6709399.38

256

280

24

2.27

CMRC1018

516331.64

6709424.13

41

52

11

3.76

CMRC1028

516253.55

6709401.16

144

156

12

6.85

CMRC1035*

516312.08

6707208.589

93

96

3

13.65

CMRC1040

516337.09

6707349.23

58

68

10

4.48

CMRC1044

516250.67

6707476.45

50

63

13

3.31

CMRC1046

516300.63

6707475.158

48

58

10

6.08

CMRC1067*

516347.07

6707773.923

85

95

10

4.07

CMRC1070

516298.2

6707800.184

37

54

17

3.61

CMRC1094

516288.48

6708100.401

43

51

8

5.38

CMRC1137

517524.16

6712292.974

204

216

12

3.55

CMRC2005

516091.3

6708205.487

58

66

8

5.69

CMRC2015*

516138.1

6708403.01

202

218

16

2.52

CMRC2030*

516164.32

6708608

200

235

35

1.55

*intercept is outside the current 2021 MRE

A comprehensive table of significant results is included in Appendix 1.

Results of this extended programme will underpin an updated MRE targeted for completion in September 2022 and a maiden ORE targeted for completion in October 2022. Capricorn's current MRE of 79.7Mt at 0.8g/t Au for 2.083 million ounces is all classified as Inferred (in spite of drill density of 25m x 25m for the majority of the resource) due to the need to validate the quality of historical data.

The assays received from drilling to date continue to line up with the historic data both spatially and for grade tenor, providing validation of the historic +660,000 metre drill database acquired with the project in July 2021 and the expectation that a significant proportion of the Inferred resource will be converted to Indicated category.

Current and previously reported drilling at the depth extremities of the resource optimisation shells (where historic drill density is broader spaced) and below them has returned results consistent with Capricorn's geological interpretations of mineralisation location, widths and grade tenor. Drilling across the project to date indicates that mineralisation remains open down dip and along strike to the north and south with multiple stacked lodes intersected.

Drilling along the Saratoga trend and Orion North trend (unmined structure to the east of the main mined Mt Gibson trend) has defined zones of better grade within the resource shell and assay results that extend below the resource shell (refer Figure's 5 & 6 - Cross section 6709050mN and 6709870mN).

4

For personal use only

Long Sections and Cross Sections

The plan below shows the drilling activity from the infill and extensional RC programme and the location of the following long and cross sections.

Figure 2. Long and cross section locations

5

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Capricorn Metals Ltd. published this content on 25 July 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 25 July 2022 22:28:04 UTC.