Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output - 1086 MWe
  • Electricity production since the beginning of the year: 5 352 286 MWh

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1095 MWe
  • Electricity production since the beginning of the year: 5 189 526 MWh

Attachments

  • Original document
  • Permalink

Disclaimer

CEZ a.s. published this content on 22 September 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 22 September 2021 08:11:04 UTC.