Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output - 1082 MWe
  • Electricity production since the beginning of the year: 5 479 466 MWh

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1088 MWe
  • Electricity production since the beginning of the year: 5 320 504 MWh

Attachments

  • Original document
  • Permalink

Disclaimer

CEZ a.s. published this content on 27 September 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 27 September 2021 10:31:09 UTC.