Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output - 1098 MWe
  • Electricity production since the beginning of the year: 7 346 962 MWh

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1103 MWe
  • Electricity production since the beginning of the year: 7 194 959 MWh

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

CEZ a.s. published this content on 07 December 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 07 December 2021 08:41:02 UTC.