Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 487 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 477,9 MWe
Unit 3 is in Mode 6 - outage
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 490 MWe

Electricity production since the beginning of the year: 6 199 672 MWh.

Jiří Bezděk , Spokesman of the ČEZ Group, Nuclear Power Plant Dukovany

Attachments

  • Original document
  • Permalink

Disclaimer

CEZ a.s. published this content on 08 June 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 08 June 2021 05:16:03 UTC.