CFOAM Limited, CFOAM Corp. (74.34% owned by CFOAM Limited, 25.66% owned by CONSOL Energy Inc) and its operating entity CFOAM LLC, Triadelphia, West Virginia, (CFOAM) provide the following update: 68' long belt continuous kiln installed and set in place at Triadelphia facility; Nitrogen generator absorber system delivered and set in place; Gas fired-incinerator/thermal oxidiser construction drawing approved; Utility upgrade works on-going with conduit for 500 Amp service run and concrete works completed; Operating permits for the new facility progressing with mandatory advertising notice published for comment until 23 June 2021; Further work is required on services, delivery and installation of equipment. A target completion date for the majority of this work is the end of theJune quarter; Final works and commissioning planned for the September quarter; and R&D work continues. The United States Department of Energy's (DOE) Office of Fossil Energy (FE) has awarded the CFOAM proposal for "Continuous Processing of Carbon Foam Products Made from Coal at Atmospheric Pressure" (or CFOAM Project) for a total project value of USD 2,421,802 commencing 1 January 2021, including DOE funding of USD 1,923,680 with CFOAM being approximately USD 1.523 million and cost share from CFOAM and CONSOL Energy Inc. of USD 498,122. This CFOAM Project will target applications capable of utilizing carbon foam at large scale, transforming coal to carbon products, with the potential for significant cost savings and consequently the ability to penetrate more competitive applications where volume and cost are paramount (e.g. building applications).