Sercel Wins Second Saudi Mega-Crew Equipment Contract

Paris, France - December 14, 2020

Sercel has won a second major contract to supply land seismic equipment to a leading seismic acquisition contractor for a 3D mega-crew survey in Saudi Arabia. It has also won a smaller contract to equip a 2D survey to be conducted by the same contractor. These two new contracts closely follow the recently announced award to Sercel of a similar large-scale contract to equip a separate Saudi 3D mega-crew survey.

The new 3D contract includes a Sercel 508XT seismic acquisition system of over 60,000 channels equipped with strings of SG-10 geophones, and a fleet of over 30 Nomad 65 Neo all-terrain vibrator trucks with a full VE464 advanced vibrator electronics package. The equipment will be deployed from March onwards on the desert survey that is scheduled to last three years.

Emmanuelle Dubu, CEO, Sercel, said: ' 'The award of this second mega-crew equipment contract in Saudi Arabia significantly strengthens Sercel's already well-established position in the Middle East. Our equipment was selected for this contract on the strength of our long-term commercial relationship with the client and the proven reliability of our high-performance seismic equipment for these challenging land surveys acquired by highly productive crews.' '


The new 3D contract includes a Sercel 508XT seismic acquisition system of over 60,000 channels equipped with strings of SG-10 geophones, and a fleet of over 30 Nomad 65 Neo all-terrain vibrator trucks with a full VE464 advanced vibrator electronics package (image courtesy of Sercel).
About CGG

CGG (www.cgg.com) is a global geoscience technology leader. Employing around 4,000 people worldwide, CGG provides a comprehensive range of data, products, services and equipment that supports the discovery and responsible management of the Earth's natural resources. CGG is listed on the Euronext Paris SA (ISIN: 0013181864).

Group Communication & Investor Relations, CGG
Christophe Barnini
(+33) 1 64 47 38 11
christophe.barnini@cgg.com

Attachments

  • Original document
  • Permalink

Disclaimer

CGG SA published this content on 14 December 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 14 December 2020 06:38:03 UTC