Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.

VOLUNTARY ANNOUNCEMENT

POWER GENERATION

FOR THE FIRST THREE QUARTERS OF 2018

China Power Clean Energy Development Company Limited (the "Company") announces that, according to the Company's preliminary statistics, the combined total power generation of the Company and its subsidiaries (collectively the "Group") from 1 January to 30 September (the "First Three Quarters") of 2018 was 7,732,959.88 MWh, representing an increase of 1.18% when compared to the same period of 2017.

The increase in the Company's total power generation when compared to the same period of last year was mainly attributable to (i) the improvement in situation of photovoltaic power curtailment; (ii) the enhancement in situation of wind power curtailment; and (iii) the increase of various renewable energy projects, including Jiangsu Hongze Biomass Project, Anhui Wuhu Waste-to-Energy Power Project, Guizhou Guiyan Waste-to-Energy Power Project, Jiangxi Ji'an Aoli Photovoltaic Power Project, and Phase I of Fujian Zhaoan Photovoltaic Power Project, when compared to the same period of last year.

However, because of the decrease in water volume in Fujian area when compared with last year, it affected the volume of power generated from hydropower projects in that region, resulting in a decline in hydropower generation when compared to the same period of last year.

A comparison between power generation by the main power generation units of the Group in the First Three Quarters of 2018 and that of the same period of 2017 is as follows:

Project NameNatural Gas Power

1

Phase I of Guangdong Dongguan Project

(ᄿ؇؇୷ɓಂධͦ)

2

Phase II of Guangdong Dongguan Project

(ᄿ؇؇୷ɚಂධͦ)

Sub-total of natural gas powerInstalled Capacity

(MW)

Power Generation for the First Three

Quarters of 2018 (MWh)

360.00 837,006.44

Power Generation for the First Three

Quarters of 2017 (MWh)

Year on

Year Changes

(%)

717,138.10 16.71%

940.00 2,638,283.81 2,746,229.00 -3.93%

1,300.00 3,475,290.25 3,463,367.10 0.34%

3

Waste-to-energy Power Yunnan Kunming Project

(ථی׺׼ධͦ)

4

Phase I of Hainan Haikou Project

(ऎیऎɹɓಂධͦ)

5

Phase II of Hainan Haikou Project

(ऎیऎɹɚಂධͦ)

6

Anhui Wuhu Project

(τᏏጾಳධͦ)

7

Guizhou Guiyan Project

(൮ψ൮ජධͦ)

Sub-total of waste-to-energy power

30.00

24.00

24.00

24.00

24.00

126.00

121,883.70

113,677.00

129,519.60

117,449.60

84,739.86

91,258.50 33.56%

115,706.00 -1.75%

140,691.60 -7.94%

15,340.50 665.62%

-

  • 567,269.76 362,996.60

-

56.27%

Power Generation for the First Three

Project NameWind Power

  • 8 Phase I of Gansu Jiuquan Project

    (͚ഠৢݰɓಂධͦ)

  • 9 Phase II of Gansu Jiuquan Project

    (͚ഠৢݰɚಂධͦ)

  • 10 Phase III of Gansu Jiuquan Project

    (͚ഠৢݰɧಂධͦ)

  • 11 Phase IV of Gansu Jiuquan Project

    (͚ഠৢݰ̬ಂධͦ)

  • 12 Phase V of Gansu Jiuquan Project

    (͚ഠৢݰʞಂධͦ)

  • 13 Gansu Anbei Project

    (͚ഠτ̏ධͦ)

  • 14 Heilongjiang Hongqi Project

    (ලᎲϪߎ࿩ධͦ)

  • 15 Heilongjiang Hailang Project

    (ලᎲϪऎईධͦ)

  • 16 Jiangsu Dafeng Project

    (Ϫᘽɽᔮධͦ)

  • 17 Inner Mongolia Chayou Zhongqi Project

    (ʫႆ̚࿀̛ʕ࿩ධͦ)

  • 18 Hubei Macheng Chunyangshan Project

    (ಳ̏௦۬ॱජʆධͦ)

Installed Capacity

(MW)

Power Generation for the First Three

Quarters of 2018 (MWh)

Year on

Quarters of 2017 (MWh)

Year Changes

(%)

100.50

151,358.08

154,737.50 -2.18%

49.50

54,834.13

46,484.00 17.96%

201.00

245,282.88

193,839.20 26.54%

100.50

143,319.27

101,348.20 41.41%

20.00

35,959.97

32,984.00 9.02%

601.00

837,002.75

604,512.20 38.46%

49.50

69,591.74

54,604.80 27.45%

49.75

88,647.28

71,186.10 24.53%

200.25

278,293.20

206,400.80 34.83%

49.50

77,905.96

68,451.30 13.81%

80.00

143,614.93

43,209.40 232.37%

Power Generation for the First Three

Project NamePower Generation for the First Three

Installed Capacity

(MW)

Year on

Quarters of 2018 (MWh)

Quarters of 2017 (MWh)

Year Changes

(%)

  • 19 German Bönen Project (ᅃ਷Bönenධͦ)

    8.00

    9,110.30

    8,791.45 3.63%

    Sub-total of wind powerPhotovoltaic Power

  • 20 Phase I of Gansu Wuwei Project

    (͚ഠ؛۾ɓಂධͦ)

  • 21 Phase II of Gansu Wuwei Project

    (͚ഠ؛۾ɚಂධͦ)

  • 22 Phase I of Gansu Baiyin Project

    (͚ഠͣვɓಂධͦ)

  • 23 Phase II of Gansu Baiyin Project

    (͚ഠͣვɚಂධͦ)

  • 24 Phase III of Gansu Baiyin Project

    (͚ഠͣვɧಂධͦ)

  • 25 Gansu Guazhou Project

    (͚ഠ͘ψධͦ)

  • 26 Hainan Changjiang Project

    (ऎی׹Ϫධͦ)

  • 27 Yunnan Yuanjiang Project

    (ථیʩϪධͦ)

  • 28 Fujian Zhangpu Project

    (၅ܔငऌධͦ)

  • 1,509.50 2,134,920.49

1,586,548.95 34.56%

20.00

24,615.05

24,595.20 0.08%

30.00

33,752.87

27,130.10 24.41%

20.00

24,933.96

25,227.60 -1.16%

30.00

35,251.69

34,688.80 1.62%

15.00

18,421.63

18,490.30 -0.37%

8.00

11,006.19

11,082.00 -0.68%

20.00

20,472.40

22,742.80 -9.98%

20.00

19,965.36

20,310.30 -1.70%

80.00

89,286.75

60,510.80 47.56%

Power Generation for the First Three

Project NamePower Generation for the First Three

Installed Capacity

(MW)

Year on

Quarters of 2018 (MWh)

Quarters of 2017 (MWh)

Year Changes

(%)

29

Sichuan Panzhihua Project

(̬ʇᖂ،ڀධͦ)

30

Jian Project

(ϪГΛτධͦ)

31

Guangdong Dongguan Huimei Project

(ᄿ؇؇୷ᅆߕධͦ)

32

Zhejiang Yunhe Project

(एϪථձධͦ)

33

Jiangxi Jian Aoli Project

(ϪГΛτ᤿Ԣධͦ)

34

Phase I of Fujian Zhaoan Project5

(၅ܔ൝τɓಂධͦ)

Sub-total of wind powerHydropower

35

Fujian Shaxikou Project

(၅ܔӍ๣ɹධͦ)

36

Fujian Niutoushan Project

(၅ܔˬ᎘ʆධͦ)

37

Fujian Zhangping Huakou Project

(၅ܔင̻ശɹධͦ)

38

Chongqing Meixihe Project

(ࠠᅅૠ๣ئධͦ)

39

Yunnan Yingjiang Hongfu Industrial Project

(ථیޮϪᒿ၅ྼุධͦ)

34.32

14.07

0.80

12.90

2.50

20.00

327.59

37,695.56

38,116.00

12,358.17

11,376.80

567.34

671.10

  • 7,025.68 4,809.50

2,521.50

19,461.40

357,335.55

916.50 175.12%

-1.10%

8.63%

-15.46%

46.08%

6,109.30 218.55%

306,777.10 16.48%

300.00

519,029.04

927,146.10 -44.02%

115.00

209,664.44

316,868.10 -33.83%

36.60

69,932.76

74,439.50 -6.05%

129.00

189,564.00

425,970.00 -55.50%

64.00

70,764.83

137,431.28 -48.51%

Attachments

  • Original document
  • Permalink

Disclaimer

China Power Clean Energy Development Co. Ltd. published this content on 18 October 2018 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 18 October 2018 08:42:13 UTC