Cokal Limited announced progress towards mining at BBM. Key Highlights: Jetty site for barge loading selected at Batu Tuhup; Preliminary layout completed; Consultants being selected for engineering and construction; Lidar survey of site contracted to start next week; Bathymetric survey of the site to start next week; Downriver Intermediate Stockpile (ISP) site selected at Buntok; Lidar survey of this site contracted to follow survey at Batu Tuhup; Road into Pit 3 reaches 68km mark having constructed 5 bridges and 10 culverts; Mining contractor mobilisation details being finalized. The site has been selected for the jetty to load barges at Batu Tuhup, about 1.5km from the temporary jetty site BBM has contracted to use for the first year.