Contact Gold Corp. announced drill results from the first 6 holes of the 2021 drill program at its Green Springs gold project in White Pine County, Nevada. The 2021 program started in late February, focused on the northern end of the 3 km long Mine Trend at Green Springs. 1.45 g/t Au over 47.24 metres in hole GS21-05 from a downhole depth of 50.29 metres at the Mine Trend (82% gold recovery in Cyanide assays), Interval includes 1.68 g/t Au over 38.1 metres (83% gold recovery in Cyanide assays) Extends gold mineralization along a key east-west striking cross structure, which was originally identified in drill hole GSC20-05 which returned 2.34 g/t over 33.53 metres (81% gold recovery in Cyanide assays), These results represent the successful implementation of advanced modeling efforts that are being incorporated into 2021 drill program to intersect thicker and high-grade portions of the Green Springs gold system 0.89 g/t Au over 12.19 metres in hole GS-02 from a downhole depth of 24.38 metres at the Mine Trend (65% gold recovery in Cyanide assays), Continued to demonstrate near surface, oxide gold mineralization at the northern portion of the Mine Trend with offsets of GS20-25 that intersected 10.7 g/t over 4.57 meters, 47 drill holes have been completed in the 2021 program to date for a total of 5,856 metres, Drill results are expected to continue to be received throughout the summer from Green Springs.