Copper Search Limited provided this update on drilling operations carried out to date at its Gawler Craton exploration projects. Drill rig has re-located to Ruby Hill Project due to timing considerations related to the South Australian Government co-funded Accelerated Discovery Initiative (ADI) award for the Douglas Creek drilling area. Douglas Creek drill hole intersected basement at 370 metres, approximately 70 metres lower than expected. This is the first basement penetration ever made on EL 6195. Basement rocks at Douglas Creek are strongly altered and brecciated metasediments and possible felsic rocks. Intense alteration and structural deformation/brecciation at Douglas Creek is seen as an endorsement of Copper Search's targeting methodology. Drilling at Douglas Creek remains in progress. Approximately 100 metres of basement lithologies have been drilled to report date. Planned depth is 800 metres, subject to rig capability.