Recently, Phase I of Chongqing Rail Transit Line 9 started trial operation. The train, developed and made by Chongqing CRRC Changke, crossed the building under construction at Hualongqiao station and became another attraction of the magic terrain of the mountain city. The mountain As model is adopted for the line, with a maximum operation speed of as high as 100km/h. Because of its bright coating of the purple-red body that is complemented with white stripes, the train is affectionately called "Fairy Purple Glow".

In addition to the attractive appearance, passenger-friendly facilities inside the carriage have also attracted much attention. Circular handrails are added in the door area of the train, providing more safety for passengers standing there; small partition between seats is added, preventing possible sliding of passengers on the seat during starting and braking; and the smart screen is used to show information such as fine food along the line, which is expected to become a "little assistant" to passengers while traveling.

It is learned that in the initial operation phase, the train will consist of 6 carriages with a maximum capacity of 2300 passengers and a peak carrying capacity of 10,700 passengers/h. It will effectively drive economic development along the line and provide convenience for the traveling of people in the surrounding areas.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

CRRC Corporation Limited published this content on 03 February 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 21 February 2022 07:40:03 UTC.