Eagle Mountain Mining Limited announced exploration update at its 100% owned Oracle Ridge Mine Project (Oracle Ridge, Project) in Arizona, USA. Assays have been received for seven drill holes completed in the Western Talon area. High-grade copper assays continue to be received at the Western Talon, outside the existing JORC mineral resource of 12.2Mt at 1.51% Cu for 184kt contained copper 1. New assay results include 0.8m at 7.75% Cu, 258g/t Ag and 2.54g/t Au (WT-21-43); 13.4m at 1.98% Cu, 15.96g/t Ag and 0.35g/t Au (WT-21-44) within 61.5m at 1.07% Cu, 9.87g/t Ag and 0.14g/t Au; 3.1m at 6.85% Cu, 32.23g/t Ag and 0.13g/t Au (WT-21-45) within 74.4m at 0.93% Cu, 6.92g/t Ag and 0.10g/t Au 12.7m at 1.88% Cu, 15.44g/t Ag and 0.28g/t Au (WT-21-46) within 43.2m at 1.05% Cu, 8.85g/t Ag and 0.23g/t Au 14m at 1.51% Cu, 12.06g/t Ag and 0.42g/t Au (WT-21-50); and 7.3m at 1.88% Cu, 12.09g/t Ag and 0.15g/t Au (WT-21-50) including 2.3m at 3.57% Cu, 20.82g/t Ag and 0.21g/t Au.

Multiple thick zones of mineralization intersected, providing potential for larger scale and lower cost mining methods to be considered. Drilling recommenced with three drill rigs following a short break over christmas. Assays are currently pending for 28 holes in the mine area and 11 holes at Golden Eagle.