Operating Data Preview 1H21

Madrid, July 13th, 2021

Key Highlights

EDPR installed capacity increased to 12.6 GW as of Jun-21(+1.15 GW YoY), with Europe and North America representing 40% and 56% of the portfolio, respectively.

Capacity additions YTD amount to 0.7 GW and EDPR has currently 2.9 GW of capacity under construction. Following the successful completion of the Asset rotation deal in the US (68% stake of a 405 MW wind portfolio), net additions YTD total 0.4 GW.

EDPR generated 15.3 TWh of clean energy in 1H21 (+5% YoY), avoiding 10mt of CO2 emissions, with Europe and North America representing 38% and 59% of total generation output, respectively. In Europe, generation increased 14% YoY, impacted by higher installed capacity and higher resource. In North America, output decreased 1% YoY reflecting the new capacity in operation offset by low resource and the impact of the one-offERCOT event in 1Q21. In Brazil, production increased 27% driven by higher installed capacity along with higher resource.

In the 1H21, EDPR achieved a 31% load factor (-0.5pp YoY) reflecting a Renewables index of 95% of P50 expected long term average Gross Capacity Factor.

In Jun-21, EDPR entered in Vietnam with the acquisition of a 28 MWac solar project, which represents the first step towards the establishment of EDPR's presence in APAC, where EDPR expects to invest part of the c.5% allocated to Other geographies within the 20 GW growth plan until 2025.

Installed Capacity

Installed Capacity by Region

2021

EBITDA + Eq. MW

1H21

YoY

Additions

AR

YTD

U/C

Europe

5.092

+526

+126

-

+126

1.180

3%

0.2%

40%

North America

7.028

+486

+537

(275)

+262

767

Latin America

436

+105

-

-

-

939

APAC

28

+28

+28

-

+28

-

EDPR

12.584

+1.145

+691

(275)

+415

2.885

Electricity Generation

GWh

1H21

1H20

YoY

Spain

2.613

2.102

+24%

Portugal

1.483

1.262

+18%

Rest of Europe

1.670

1.699

(2%)

Europe

5.766

5.063

+14%

US

8.474

8.792

(4%)

Canada

106

41

+156%

Mexico

498

380

+31%

North America

9.079

9.213

(1%)

Brazil

494

388

+27%

Latin America

494

388

+27%

EDPR

15.338

14.664

+5%

Load Factor

NCF (%)

1H21

1H20

YoY

Spain

28%

24%

+4pp

Portugal

28%

25%

+3pp

Rest of Europe

26%

31%

-4pp

Europe

28%

26%

+1pp

US

33%

36%

-2pp

Canada

30%

32%

-2pp

Mexico

47%

44%

+3pp

North America

34%

36%

-2pp

Brazil

34%

27%

+8pp

Latin America

34%

27%

+8pp

EDPR

31%

32%

-0,5pp

Renewables Index (vs. expected LT avg. Gross Capacity Factor)

(%)

1H21

1H20

YoY

EDPR

95%

94%

+1pp

12,6 GW

56%

Europe North America LatAm APAC

Generation by Region

3%

38%

15,3 TWh

59%

Europe

North America

LatAm

NCF (%)

vs. P50 GCF (%)

Europe

28%

97%

N. America

34%

94%

LatAm

34%

105%

EDPR

31%

95%

Note: Solar capacity reported in MWac

EDPR Investor Relations

Phone: +34 902 830 700

EDP Renováveis, S.A. | Head office: Plaza de la Gesta, 2 - 33007 Oviedo, Spain

Site: www.edpr.com

Email: ir@edpr.com

Operating Data Preview 1H21

Madrid, July 13th, 2021

Installed Capacity

Installed Capacity by Technology

MW

1H21

YTD

U/C

Spain

2.137

-

101

Portugal

1.238

+10

125

Rest of Europe

1.476

+74

685

Europe

4.852

+83

911

US

5.898

+70

671

Canada

130

+62

-

95%

12,6 GW

5%

Mexico

400

-

96

North America

6.428

+132

767

0.4%

Brazil

436

-

939

Latin America

436

-

939

Vietnam

28

+28

-

APAC

28

+28

-

EBITDA MW

11.743

+243

2.616

Spain

167

-

-

Wind Onshore

Solar

Wind Offshore

Portugal

31

-

-

Rest of Europe

43

+43

269

Europe

240

+43

269

US

601

+130

-

North America

601

+130

-

Eq. Consolidated

841

+172

269

EDPR

12.584

+415

2.885

Wind Onshore

Capacity Additions YTD

MW

1H21

YTD

U/C

Spain

2.137

-

101

Portugal

1.234

+10

125

Rest of Europe

1.426

+74

685

Europe

4.797

+83

911

US

5.739

+1

453

Canada

130

+62

-

Mexico

200

-

96

North America

6.068

+63

549

Brazil

436

-

735

Latin America

436

-

735

EBITDA MW

11.301

+146

2.195

Spain

167

-

-

Portugal

20

-

-

Europe

187

-

-

US

462

+130

-

North America

462

+130

-

Eq. Consolidated

648

+130

-

EDPR

11.949

+276

2.195

Project

Country

MW

Overequipments

Portugal

+10

Serracapriola

Italy

+28

Aria del Vento

Italy

+16

Vaudrimesnil

France

+10

Preuseville 2

France

+7

7 Domaines

France

+13

Headwaters II

US

+148

Wildcat Creek

US

+100

Reloj del Sol

US

+89

Crossing Trails

US

+69

Nation Rise

Canada

+62

Wind Onshore Additions YTD

+551

Solar

Capacity Additions YTD

MW

1H21

YTD

U/C

Portugal

5

-

-

Rest of Europe

50

-

-

Europe

55

-

-

US

159

+69

218

Mexico

200

-

-

North America

359

+69

218

Brazil

-

-

204

Latin America

-

-

204

Vietnam

28

+28

-

APAC

28

+28

-

EBITDA MW

442

+97

421

US

139

-

-

North America

139

-

-

Eq. Consolidated

139

-

-

EDPR

581

+97

421

Project

Country

MW

Distributed Solar

US

+69

Trung Son

Vietnam

+28

Solar Additions YTD

+97

Wind Offshore

Capacity Additions YTD

MW

1H21

YTD

U/C

Project

Country

MW

Portugal

11

-

-

Seamade

Belgium

+43

Rest of Europe

43

+43

269

Europe

53

+43

269

EDPR Eq. Consolidated

53

+43

269

Ocean Winds Gross Capacity

512

+487

950

Wind Offshore Additions YTD

+43

Wind Offshore Gross Additions YTD

+487

Note: Solar capacity reported in MWac

EDPR Investor Relations

Phone: +34 902 830 700

EDP Renováveis, S.A. | Head office: Plaza de la Gesta, 2 - 33007 Oviedo, Spain

Site: www.edpr.com

Email: ir@edpr.com

Attachments

  • Original document
  • Permalink

Disclaimer

EDP Renovaveis SA published this content on 13 July 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 13 July 2021 16:48:05 UTC.