April 14, 2021

J-POWER

J-POWER Constructs Onabara Power Plant

Construction of Hydroelectric Power Plant Utilizing Ecological Flow

Electric Power Development Co., Ltd. (hereafter "J-POWER") announces that it has decided to construct Onabara Power Plant in Japan.

This project is to construct a hydroelectric power plant, of which maximum capacity is 990kW, just below the existing Tedorigawa Dam. This power plant will utilize unused ecological flow from Tedorigawa Dam.

J-POWER will start preparation for construction aiming for starting commercial operation in November 2024.

J-POWER actively continues to develop small and medium scale hydroelectric power plants to utilize carbon free and renewable water resources.

Onabara Power Plant

Onabara

Tedorigawa Dam

Power Plant

Onabara Power Plant post-completion rendering

Attachments

  • Original document
  • Permalink

Disclaimer

EPDC - Electric Power Development Co. Ltd. published this content on 14 April 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 14 April 2021 05:06:02 UTC.