April 14, 2021
J-POWER
J-POWER Constructs Onabara Power Plant
Construction of Hydroelectric Power Plant Utilizing Ecological Flow
Electric Power Development Co., Ltd. (hereafter "J-POWER") announces that it has decided to construct Onabara Power Plant in Japan.
This project is to construct a hydroelectric power plant, of which maximum capacity is 990kW, just below the existing Tedorigawa Dam. This power plant will utilize unused ecological flow from Tedorigawa Dam.
J-POWER will start preparation for construction aiming for starting commercial operation in November 2024.
J-POWER actively continues to develop small and medium scale hydroelectric power plants to utilize carbon free and renewable water resources.
Onabara Power Plant
Onabara | ||
Tedorigawa Dam | Power Plant | |
Onabara Power Plant post-completion rendering
Attachments
- Original document
- Permalink
Disclaimer
EPDC - Electric Power Development Co. Ltd. published this content on 14 April 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 14 April 2021 05:06:02 UTC.